Construction of 2 lane with paved shoulder of Kund Bypass from Design Km 35.130 to Km 47.700 existing Km 33.130 to Km 41.260 of NH-109 in the State of Uttarakhand
Original Cost
₹247 Cr
Baseline estimate
Revised Cost
₹247 Cr
Latest approved cost
Expenditure
₹152 Cr
Spent to date
Utilization
61.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹95 Cr
Budget left
Budget Utilization
61.5%Spent
₹152 Cr
Remaining
₹95 Cr
Total
₹247 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/05/2020
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹247 Cr — no cost escalation recorded.
Expenditure stands at ₹152 Cr, which is 61.5% of the revised project cost.
Remaining budget: ₹95 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2 lane with paved shoulder of Kund Bypass from Design Km 35.130 to Km 47.700 existing Km 33.130 to Km 41.260 of NH-109 in the State of Uttarakhand is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹247.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2 lane with paved shoulder of Kund Bypass from Design Km 35.130 "?
- Construction of 2 lane with paved shoulder of Kund Bypass from Design Km 35.130 to Km 47.700 existing Km 33.130 to Km 41.260 of NH-109 in the State of Uttarakhand is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹247 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹247 Cr has not been significantly revised. Expenditure: ₹152 Cr (61.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2 lane with paved shoulder of Kund Bypass fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617929. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2 lane with paved shoulder of Kund Bypass fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.