Roads & HighwaysIPM · Central Project +113.9% overrun#618291

Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3

Ministry of Road Transport & HighwaysNagaland
Revised Cost: ₹342 CrUtilization: 37.5%Overrun: +₹182 Cr

Original Cost

₹160 Cr

Baseline estimate

+114% overrun

Revised Cost

₹342 Cr

Latest approved cost

Expenditure

₹129 Cr

Spent to date

Utilization

37.5%

Of revised budget

Escalated

Cost Status

+113.9%

+₹182 Cr increase

Remaining

₹214 Cr

Budget left

Budget Utilization

37.5%
0%25%50%75%100%

Spent

₹129 Cr

Remaining

₹214 Cr

Total

₹342 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹160 Cr

Revised Cost

₹342 Cr

Increase

+₹182 Cr

Escalation

+113.9%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

15/06/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618291
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-08

Financial Summary

Original Cost₹160 Cr
Revised Cost₹342 Cr
Expenditure₹129 Cr
Original End Date15/06/2025
Revised Date31/12/2026

Project Intelligence

Cost has increased by ₹182 Cr (113.9%) from the original estimate of ₹160 Cr.

Expenditure stands at ₹129 Cr, which is 37.5% of the revised project cost.

Remaining budget: ₹214 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹160.00 Cr, later revised to ₹342.29 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- "?
Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹160 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹160 Cr and has been revised to ₹342 Cr — a cost overrun of +113.9%. Expenditure to date: ₹129 Cr (37.5% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-lane with Paved shoulder of Kohima-Bypass is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618291. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-lane with Paved shoulder of Kohima-Bypass is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.