Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3
Original Cost
₹160 Cr
Baseline estimate
Revised Cost
₹342 Cr
Latest approved cost
Expenditure
₹129 Cr
Spent to date
Utilization
37.5%
Of revised budget
Cost Status
+113.9%
+₹182 Cr increase
Remaining
₹214 Cr
Budget left
Budget Utilization
37.5%Spent
₹129 Cr
Remaining
₹214 Cr
Total
₹342 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹160 Cr
Revised Cost
₹342 Cr
Increase
+₹182 Cr
Escalation
+113.9%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/06/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹182 Cr (113.9%) from the original estimate of ₹160 Cr.
Expenditure stands at ₹129 Cr, which is 37.5% of the revised project cost.
Remaining budget: ₹214 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹160.00 Cr, later revised to ₹342.29 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- "?
- Construction of 2-lane with Paved shoulder of Kohima-Bypass Road connecting NH- 39 New NH-02, NH150New NH-02, NH7-61 New NH-29 and NH-39 New NH-02 from Design km 21.000 to km 32.268 [Design length11.268 km] in the state of Nagaland Under SARDP-NE on EPC Mode Package- 3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹160 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹160 Cr and has been revised to ₹342 Cr — a cost overrun of +113.9%. Expenditure to date: ₹129 Cr (37.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-lane with Paved shoulder of Kohima-Bypass is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618291. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-lane with Paved shoulder of Kohima-Bypass is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.