Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29 and NH-39New NH-02 from design Km 0.00 to Km 10.500 in the State of Nagaland under SARDP-NE on EPC Mode Package-1 -Balance work
Original Cost
₹232 Cr
Baseline estimate
Revised Cost
₹351 Cr
Latest approved cost
Expenditure
₹121 Cr
Spent to date
Utilization
34.5%
Of revised budget
Cost Status
+51.2%
+₹119 Cr increase
Remaining
₹230 Cr
Budget left
Budget Utilization
34.5%Spent
₹121 Cr
Remaining
₹230 Cr
Total
₹351 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹232 Cr
Revised Cost
₹351 Cr
Increase
+₹119 Cr
Escalation
+51.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/11/2026
Revised Completion
08/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹119 Cr (51.2%) from the original estimate of ₹232 Cr.
Expenditure stands at ₹121 Cr, which is 34.5% of the revised project cost.
Remaining budget: ₹230 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29 and NH-39New NH-02 from design Km 0.00 to Km 10.500 in the State of Nagaland under SARDP-NE on EPC Mode Package-1 -Balance work is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹232.00 Cr, later revised to ₹350.88 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting NH-3"?
- Construction of 2-Lane with paved shoulder of Kohima-Bypass Road connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29 and NH-39New NH-02 from design Km 0.00 to Km 10.500 in the State of Nagaland under SARDP-NE on EPC Mode Package-1 -Balance work is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹232 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹232 Cr and has been revised to ₹351 Cr — a cost overrun of +51.2%. Expenditure to date: ₹121 Cr (34.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-Lane with paved shoulder of Kohima-Bypass is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618293. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Lane with paved shoulder of Kohima-Bypass is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.