Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29, NH-39New NH-02 from Design Km 32.00 to Design Km 43.454Design Length-11.454 Km in the State of Nagaland under SARDP-NE on EPC Mode Package-IV

Ministry of Road Transport & HighwaysNagaland
Revised Cost: ₹202 CrUtilization: 50.7%

Original Cost

₹202 Cr

Baseline estimate

On budget

Revised Cost

₹202 Cr

Latest approved cost

Expenditure

₹102 Cr

Spent to date

Utilization

50.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹100 Cr

Budget left

Budget Utilization

50.7%
0%25%50%75%100%

Spent

₹102 Cr

Remaining

₹100 Cr

Total

₹202 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/04/2022

Revised Completion

31/12/2026

Completed

Project Details

Project Code618290
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-08

Financial Summary

Original Cost₹202 Cr
Revised Cost₹202 Cr
Expenditure₹102 Cr
Original End Date17/04/2022
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹202 Cr — no cost escalation recorded.

Expenditure stands at ₹102 Cr, which is 50.7% of the revised project cost.

Remaining budget: ₹100 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29, NH-39New NH-02 from Design Km 32.00 to Design Km 43.454Design Length-11.454 Km in the State of Nagaland under SARDP-NE on EPC Mode Package-IV is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹202.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH-"?
Construction of 2-lane with Paved shoulder of Kohima- Bypass Road Connecting NH-39New NH-02, NH-150New NH-02, NH-61New NH-29, NH-39New NH-02 from Design Km 32.00 to Design Km 43.454Design Length-11.454 Km in the State of Nagaland under SARDP-NE on EPC Mode Package-IV is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹202 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹202 Cr has not been significantly revised. Expenditure: ₹102 Cr (50.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-lane with Paved shoulder of Kohima- Bypass is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618290. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-lane with Paved shoulder of Kohima- Bypass is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.