Construction of 2 lane with paved shoulder for the work of Development of remaining sections of NH-325 Balotra to sanderao via Jalore to 2 lane with paved shoulder configuration by Construction of Byasses for town portions1 Asotra- Brahmdham bypass 2Siwana Bypass 3 Mokalsar Bypass 4 Major realignment at Kathadi 5 Major realignment at Bishangarh 6 Jalore Bypass 7 Ahore Town portion 8 Dujana Bypass in the state of Rajasthan on EPC Mode
Original Cost
₹411 Cr
Baseline estimate
Revised Cost
₹411 Cr
Latest approved cost
Expenditure
₹298 Cr
Spent to date
Utilization
72.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹113 Cr
Budget left
Budget Utilization
72.4%Spent
₹298 Cr
Remaining
₹113 Cr
Total
₹411 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
11/05/2024
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹411 Cr — no cost escalation recorded.
Expenditure stands at ₹298 Cr, which is 72.4% of the revised project cost.
Remaining budget: ₹113 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2 lane with paved shoulder for the work of Development of remaining sections of NH-325 Balotra to sanderao via Jalore to 2 lane with paved shoulder configuration by Construction of Byasses for town portions1 Asotra- Brahmdham bypass 2Siwana Bypass 3 Mokalsar Bypass 4 Major realignment at Kathadi 5 Major realignment at Bishangarh 6 Jalore Bypass 7 Ahore Town portion 8 Dujana Bypass in the state of Rajasthan on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹411.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2 lane with paved shoulder for the work of Development of remain"?
- Construction of 2 lane with paved shoulder for the work of Development of remaining sections of NH-325 Balotra to sanderao via Jalore to 2 lane with paved shoulder configuration by Construction of Byasses for town portions1 Asotra- Brahmdham bypass 2Siwana Bypass 3 Mokalsar Bypass 4 Major realignment at Kathadi 5 Major realignment at Bishangarh 6 Jalore Bypass 7 Ahore Town portion 8 Dujana Bypass in the state of Rajasthan on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹411 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹411 Cr has not been significantly revised. Expenditure: ₹298 Cr (72.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2 lane with paved shoulder for the work of D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618011. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2 lane with paved shoulder for the work of D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.