Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 Package-3 on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode under NHO-NE
Original Cost
₹721 Cr
Baseline estimate
Revised Cost
₹721 Cr
Latest approved cost
Expenditure
₹103 Cr
Spent to date
Utilization
14.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹618 Cr
Budget left
Budget Utilization
14.3%Spent
₹103 Cr
Remaining
₹618 Cr
Total
₹721 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/11/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹721 Cr — no cost escalation recorded.
Expenditure stands at ₹103 Cr, which is 14.3% of the revised project cost.
Remaining budget: ₹618 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 Package-3 on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode under NHO-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹721.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 Package-3 on Sa"?
- Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 Package-3 on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode under NHO-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹721 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹721 Cr has not been significantly revised. Expenditure: ₹103 Cr (14.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-lane Aizawl Bypass from km 15.200 to km 34 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618324. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-lane Aizawl Bypass from km 15.200 to km 34 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.