Bhadrak-Nergundi - 3rd line 80 km
Original Cost
₹1284 Cr
Baseline estimate
Revised Cost
₹1600 Cr
Latest approved cost
Expenditure
₹1404 Cr
Spent to date
Utilization
87.8%
Of revised budget
Cost Status
+24.6%
+₹316 Cr increase
Remaining
₹196 Cr
Budget left
Budget Utilization
87.8%Spent
₹1404 Cr
Remaining
₹196 Cr
Total
₹1600 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1284 Cr
Revised Cost
₹1600 Cr
Increase
+₹316 Cr
Escalation
+24.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/11/2024
Revised Completion
31/01/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹316 Cr (24.6%) from the original estimate of ₹1284 Cr.
Expenditure stands at ₹1404 Cr, which is 87.8% of the revised project cost.
Remaining budget: ₹196 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Bhadrak-Nergundi - 3rd line 80 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1284.00 Cr, later revised to ₹1600.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Bhadrak-Nergundi - 3rd line 80 km"?
- Bhadrak-Nergundi - 3rd line 80 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Odisha. Original cost: ₹1284 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1284 Cr and has been revised to ₹1600 Cr — a cost overrun of +24.6%. Expenditure to date: ₹1404 Cr (87.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Bhadrak-Nergundi - 3rd line 80 km is under the Ministry of Railways in the Railways sector. Project code: 705510. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Bhadrak-Nergundi - 3rd line 80 km is one of several Bihar projects tracked under the Railways sector on the IPM system.