Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 Package-4B in the State of Manipur on EPC Mode
Original Cost
₹178 Cr
Baseline estimate
Revised Cost
₹178 Cr
Latest approved cost
Expenditure
₹101 Cr
Spent to date
Utilization
56.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹77 Cr
Budget left
Budget Utilization
56.7%Spent
₹101 Cr
Remaining
₹77 Cr
Total
₹178 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/11/2026
Revised Completion
07/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹178 Cr — no cost escalation recorded.
Expenditure stands at ₹101 Cr, which is 56.7% of the revised project cost.
Remaining budget: ₹77 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 Package-4B in the State of Manipur on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹178.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tu"?
- Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 Package-4B in the State of Manipur on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹178 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹178 Cr has not been significantly revised. Expenditure: ₹101 Cr (56.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of Widening to 2 Two lane with hard shoulder of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618348. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Widening to 2 Two lane with hard shoulder of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.