Roads & HighwaysIPM · Central Project#617954

Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹398 CrUtilization: 53.2%

Original Cost

₹398 Cr

Baseline estimate

On budget

Revised Cost

₹398 Cr

Latest approved cost

Expenditure

₹212 Cr

Spent to date

Utilization

53.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹186 Cr

Budget left

Budget Utilization

53.2%
0%25%50%75%100%

Spent

₹212 Cr

Remaining

₹186 Cr

Total

₹398 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/02/2025

Revised Completion

30/04/2026

Completed

Project Details

Project Code617954
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-05

Financial Summary

Original Cost₹398 Cr
Revised Cost₹398 Cr
Expenditure₹212 Cr
Original End Date23/02/2025
Revised Date30/04/2026

Project Intelligence

Project is within original budget of ₹398 Cr — no cost escalation recorded.

Expenditure stands at ₹212 Cr, which is 53.2% of the revised project cost.

Remaining budget: ₹186 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹398.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder "?
Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹398 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹398 Cr has not been significantly revised. Expenditure: ₹212 Cr (53.2% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Balance work of Rehabilitation and upgrading to 2lane/2lane is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617954. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Rehabilitation and upgrading to 2lane/2lane is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.