Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952
Original Cost
₹398 Cr
Baseline estimate
Revised Cost
₹398 Cr
Latest approved cost
Expenditure
₹212 Cr
Spent to date
Utilization
53.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹186 Cr
Budget left
Budget Utilization
53.2%Spent
₹212 Cr
Remaining
₹186 Cr
Total
₹398 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/02/2025
Revised Completion
30/04/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹398 Cr — no cost escalation recorded.
Expenditure stands at ₹212 Cr, which is 53.2% of the revised project cost.
Remaining budget: ₹186 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹398.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder "?
- Balance work of Rehabilitation and upgrading to 2lane/2lane with paved shoulder configuration and strengthening from from Km 343.80 to 400.33 of Gowribidanur-Chik Ballapur section in the state of Karnataka Under Annual Plan 2021-22 under EPC Mode.-952 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹398 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹398 Cr has not been significantly revised. Expenditure: ₹212 Cr (53.2% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Balance work of Rehabilitation and upgrading to 2lane/2lane is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617954. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Rehabilitation and upgrading to 2lane/2lane is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.