Balance work of Rehabilitation and Up-gradation to 4-Lane configuration of Ras-Beawar Section Km 00.000 to km 30.050 of NH-158 in the State of Rajasthan under Green National Highway Corridor Project GNHCP.
Original Cost
₹278 Cr
Baseline estimate
Revised Cost
₹278 Cr
Latest approved cost
Expenditure
₹104 Cr
Spent to date
Utilization
37.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹174 Cr
Budget left
Budget Utilization
37.6%Spent
₹104 Cr
Remaining
₹174 Cr
Total
₹278 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/12/2026
Revised Completion
27/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹278 Cr — no cost escalation recorded.
Expenditure stands at ₹104 Cr, which is 37.6% of the revised project cost.
Remaining budget: ₹174 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Rehabilitation and Up-gradation to 4-Lane configuration of Ras-Beawar Section Km 00.000 to km 30.050 of NH-158 in the State of Rajasthan under Green National Highway Corridor Project GNHCP. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹278.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Rehabilitation and Up-gradation to 4-Lane configuration of Ras-B"?
- Balance work of Rehabilitation and Up-gradation to 4-Lane configuration of Ras-Beawar Section Km 00.000 to km 30.050 of NH-158 in the State of Rajasthan under Green National Highway Corridor Project GNHCP. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹278 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹278 Cr has not been significantly revised. Expenditure: ₹104 Cr (37.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of Rehabilitation and Up-gradation to 4-Lane co is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618235. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Rehabilitation and Up-gradation to 4-Lane co is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.