Balance work of Rehabilitation and Up-gradation to 2-lane road with paved shoulders configuration for NH- 965DD from Pacharal-Mandangad-Mhapral-Rajewadi Upto Junction of NH-66 Ch-22700 to 75100 Km and Ambadave connector Birth place of Dr. Babasaheb Ambedkar Ch-0000 to 7325 Km length Km 59.725 in the state of Maharashtra on EPC mode. Balance Work
Original Cost
₹389 Cr
Baseline estimate
Revised Cost
₹342 Cr
Latest approved cost
Expenditure
₹250 Cr
Spent to date
Utilization
73.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹92 Cr
Budget left
Budget Utilization
73.1%Spent
₹250 Cr
Remaining
₹92 Cr
Total
₹342 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/01/2024
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹389 Cr — no cost escalation recorded.
Expenditure stands at ₹250 Cr, which is 73.1% of the revised project cost.
Remaining budget: ₹92 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Rehabilitation and Up-gradation to 2-lane road with paved shoulders configuration for NH- 965DD from Pacharal-Mandangad-Mhapral-Rajewadi Upto Junction of NH-66 Ch-22700 to 75100 Km and Ambadave connector Birth place of Dr. Babasaheb Ambedkar Ch-0000 to 7325 Km length Km 59.725 in the state of Maharashtra on EPC mode. Balance Work is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹389.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Rehabilitation and Up-gradation to 2-lane road with paved should"?
- Balance work of Rehabilitation and Up-gradation to 2-lane road with paved shoulders configuration for NH- 965DD from Pacharal-Mandangad-Mhapral-Rajewadi Upto Junction of NH-66 Ch-22700 to 75100 Km and Ambadave connector Birth place of Dr. Babasaheb Ambedkar Ch-0000 to 7325 Km length Km 59.725 in the state of Maharashtra on EPC mode. Balance Work is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹389 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹389 Cr and has been revised to ₹342 Cr — a cost overrun of -12.2%. Expenditure to date: ₹250 Cr (73.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of Rehabilitation and Up-gradation to 2-lane ro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618198. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Rehabilitation and Up-gradation to 2-lane ro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.