Balance work of Construction of Ring Road for Raebareli City on eastern side of NH-24B Phase-1 on EPC mode.
Original Cost
₹320 Cr
Baseline estimate
Revised Cost
₹348 Cr
Latest approved cost
Expenditure
₹293 Cr
Spent to date
Utilization
84.3%
Of revised budget
Cost Status
+8.7%
+₹28 Cr increase
Remaining
₹55 Cr
Budget left
Budget Utilization
84.3%Spent
₹293 Cr
Remaining
₹55 Cr
Total
₹348 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹320 Cr
Revised Cost
₹348 Cr
Increase
+₹28 Cr
Escalation
+8.7%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/04/2022
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹28 Cr (8.7%) from the original estimate of ₹320 Cr.
Expenditure stands at ₹293 Cr, which is 84.3% of the revised project cost.
Remaining budget: ₹55 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Construction of Ring Road for Raebareli City on eastern side of NH-24B Phase-1 on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹320.00 Cr, later revised to ₹347.80 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Construction of Ring Road for Raebareli City on eastern side of "?
- Balance work of Construction of Ring Road for Raebareli City on eastern side of NH-24B Phase-1 on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹320 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹320 Cr and has been revised to ₹348 Cr — a cost overrun of +8.7%. Expenditure to date: ₹293 Cr (84.3% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of Construction of Ring Road for Raebareli City is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618009. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Construction of Ring Road for Raebareli City is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.