Roads & HighwaysIPM · Central Project#618296

Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO

Ministry of Road Transport & HighwaysNagaland
Revised Cost: ₹331 CrUtilization: 81.0%

Original Cost

₹331 Cr

Baseline estimate

On budget

Revised Cost

₹331 Cr

Latest approved cost

Expenditure

₹268 Cr

Spent to date

Utilization

81.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹63 Cr

Budget left

Budget Utilization

81.0%
0%25%50%75%100%

Spent

₹268 Cr

Remaining

₹63 Cr

Total

₹331 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

21/11/2025

Revised Completion

11/09/2026

Completed

Project Details

Project Code618296
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-08

Financial Summary

Original Cost₹331 Cr
Revised Cost₹331 Cr
Expenditure₹268 Cr
Original End Date21/11/2025
Revised Date11/09/2026

Project Intelligence

Project is within original budget of ₹331 Cr — no cost escalation recorded.

Expenditure stands at ₹268 Cr, which is 81.0% of the revised project cost.

Remaining budget: ₹63 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹331.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami ro"?
Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹331 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹331 Cr has not been significantly revised. Expenditure: ₹268 Cr (81.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Balance work of Construction of 2-lane with hard shoulder of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618296. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Construction of 2-lane with hard shoulder of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.