Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO
Original Cost
₹331 Cr
Baseline estimate
Revised Cost
₹331 Cr
Latest approved cost
Expenditure
₹268 Cr
Spent to date
Utilization
81.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹63 Cr
Budget left
Budget Utilization
81.0%Spent
₹268 Cr
Remaining
₹63 Cr
Total
₹331 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
21/11/2025
Revised Completion
11/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹331 Cr — no cost escalation recorded.
Expenditure stands at ₹268 Cr, which is 81.0% of the revised project cost.
Remaining budget: ₹63 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹331.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami ro"?
- Balance work of Construction of 2-lane with hard shoulder of Kohima - Jessami road on NH-29 old NH-150 from existing km 98.380 near Chizami vill. to km120.367 Nagaland/Manipur Border [Design km 95.700 to design km 117.200] [Design Length 21.500 km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package-V under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹331 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹331 Cr has not been significantly revised. Expenditure: ₹268 Cr (81.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of Construction of 2-lane with hard shoulder of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618296. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Construction of 2-lane with hard shoulder of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.