ATF Pipeline from BPCLs Malkapur POL Installation to Hyderabad International airport
Original Cost
₹215 Cr
Baseline estimate
Revised Cost
₹215 Cr
Latest approved cost
Expenditure
₹48 Cr
Spent to date
Utilization
22.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹168 Cr
Budget left
Budget Utilization
22.1%Spent
₹48 Cr
Remaining
₹168 Cr
Total
₹215 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
24/09/2027
Revised Completion
30/09/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹215 Cr — no cost escalation recorded.
Expenditure stands at ₹48 Cr, which is 22.1% of the revised project cost.
Remaining budget: ₹168 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
ATF Pipeline from BPCLs Malkapur POL Installation to Hyderabad International airport is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹215.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "ATF Pipeline from BPCLs Malkapur POL Installation to Hyderabad International ai"?
- ATF Pipeline from BPCLs Malkapur POL Installation to Hyderabad International airport is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Telangana. Original cost: ₹215 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹215 Cr has not been significantly revised. Expenditure: ₹48 Cr (22.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- ATF Pipeline from BPCLs Malkapur POL Installation to Hydera is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 617822. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. ATF Pipeline from BPCLs Malkapur POL Installation to Hydera is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.