Original Cost
₹1371 Cr
Baseline estimate
Revised Cost
₹1403 Cr
Latest approved cost
Expenditure
₹337 Cr
Spent to date
Utilization
24.0%
Of revised budget
Cost Status
+2.4%
+₹32 Cr increase
Remaining
₹1067 Cr
Budget left
Budget Utilization
24.0%Spent
₹337 Cr
Remaining
₹1067 Cr
Total
₹1403 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1371 Cr
Revised Cost
₹1403 Cr
Increase
+₹32 Cr
Escalation
+2.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/10/2026
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹32 Cr (2.4%) from the original estimate of ₹1371 Cr.
Expenditure stands at ₹337 Cr, which is 24.0% of the revised project cost.
Remaining budget: ₹1067 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Akkalkot MH/KN border New Greenfield corridor from Km 512.000 to Km 548.400 of NH-150C part of Akkalkot KN/TS Border section Package XIV is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1371.00 Cr, later revised to ₹1403.49 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Akkalkot MH/KN border New Greenfield corridor from Km 512.000 to Km 548.400 of "?
- Akkalkot MH/KN border New Greenfield corridor from Km 512.000 to Km 548.400 of NH-150C part of Akkalkot KN/TS Border section Package XIV is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹1371 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1371 Cr and has been revised to ₹1403 Cr — a cost overrun of +2.4%. Expenditure to date: ₹337 Cr (24.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Akkalkot MH/KN border New Greenfield corridor from Km 512.0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618636. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Akkalkot MH/KN border New Greenfield corridor from Km 512.0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.