6L of existing 4L from Gundlapochampally to Bowenpally from km 471.300 to km 481.331 of NH-44
Original Cost
₹522 Cr
Baseline estimate
Revised Cost
₹528 Cr
Latest approved cost
Expenditure
₹257 Cr
Spent to date
Utilization
48.7%
Of revised budget
Cost Status
+1.2%
+₹6 Cr increase
Remaining
₹271 Cr
Budget left
Budget Utilization
48.7%Spent
₹257 Cr
Remaining
₹271 Cr
Total
₹528 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹522 Cr
Revised Cost
₹528 Cr
Increase
+₹6 Cr
Escalation
+1.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/07/2024
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹6 Cr (1.2%) from the original estimate of ₹522 Cr.
Expenditure stands at ₹257 Cr, which is 48.7% of the revised project cost.
Remaining budget: ₹271 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L of existing 4L from Gundlapochampally to Bowenpally from km 471.300 to km 481.331 of NH-44 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹522.00 Cr, later revised to ₹528.21 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L of existing 4L from Gundlapochampally to Bowenpally from km 471.300 to km 4"?
- 6L of existing 4L from Gundlapochampally to Bowenpally from km 471.300 to km 481.331 of NH-44 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹522 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹522 Cr and has been revised to ₹528 Cr — a cost overrun of +1.2%. Expenditure to date: ₹257 Cr (48.7% of revised cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- 6L of existing 4L from Gundlapochampally to Bowenpally from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618559. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L of existing 4L from Gundlapochampally to Bowenpally from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.