6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village From KM. 54.000 to KM. 90.000Pkg-3
Original Cost
₹1577 Cr
Baseline estimate
Revised Cost
₹1711 Cr
Latest approved cost
Expenditure
₹328 Cr
Spent to date
Utilization
19.2%
Of revised budget
Cost Status
+8.5%
+₹134 Cr increase
Remaining
₹1383 Cr
Budget left
Budget Utilization
19.2%Spent
₹328 Cr
Remaining
₹1383 Cr
Total
₹1711 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1577 Cr
Revised Cost
₹1711 Cr
Increase
+₹134 Cr
Escalation
+8.5%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/10/2027
Revised Completion
05/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹134 Cr (8.5%) from the original estimate of ₹1577 Cr.
Expenditure stands at ₹328 Cr, which is 19.2% of the revised project cost.
Remaining budget: ₹1383 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village From KM. 54.000 to KM. 90.000Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1577.00 Cr, later revised to ₹1711.44 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura"?
- 6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village From KM. 54.000 to KM. 90.000Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹1577 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1577 Cr and has been revised to ₹1711 Cr — a cost overrun of +8.5%. Expenditure to date: ₹328 Cr (19.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618727. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Greenfield Varanasi-Ranchi-Kolkata Highway from junction is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.