6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 to km 396.800 Pkg. 1
Original Cost
₹1216 Cr
Baseline estimate
Revised Cost
₹1242 Cr
Latest approved cost
Expenditure
₹731 Cr
Spent to date
Utilization
58.9%
Of revised budget
Cost Status
+2.1%
+₹26 Cr increase
Remaining
₹510 Cr
Budget left
Budget Utilization
58.9%Spent
₹731 Cr
Remaining
₹510 Cr
Total
₹1242 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1216 Cr
Revised Cost
₹1242 Cr
Increase
+₹26 Cr
Escalation
+2.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
29/03/2024
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹26 Cr (2.1%) from the original estimate of ₹1216 Cr.
Expenditure stands at ₹731 Cr, which is 58.9% of the revised project cost.
Remaining budget: ₹510 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 to km 396.800 Pkg. 1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1216.00 Cr, later revised to ₹1241.66 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 to km 396.800 Pkg. 1"?
- 6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 to km 396.800 Pkg. 1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹1216 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1216 Cr and has been revised to ₹1242 Cr — a cost overrun of +2.1%. Expenditure to date: ₹731 Cr (58.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618681. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Aluru - Jakkuva Section of NH-130CD Road from km 365.033 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.