Roads & HighwaysIPM · Central Project +0.6% overrun#619105

6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2

Ministry of Road Transport & HighwaysPunjab
Revised Cost: ₹1565 CrUtilization: 46.2%Overrun: +₹10 Cr

Original Cost

₹1555 Cr

Baseline estimate

+1% overrun

Revised Cost

₹1565 Cr

Latest approved cost

Expenditure

₹723 Cr

Spent to date

Utilization

46.2%

Of revised budget

Escalated

Cost Status

+0.6%

+₹10 Cr increase

Remaining

₹841 Cr

Budget left

Budget Utilization

46.2%
0%25%50%75%100%

Spent

₹723 Cr

Remaining

₹841 Cr

Total

₹1565 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1555 Cr

Revised Cost

₹1565 Cr

Increase

+₹10 Cr

Escalation

+0.6%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/09/2027

Revised Completion

29/09/2027

Completed

Project Details

Project Code619105
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StatePunjab
Data Month2026-08

Financial Summary

Original Cost₹1555 Cr
Revised Cost₹1565 Cr
Expenditure₹723 Cr
Original End Date29/09/2027
Revised Date29/09/2027

Project Intelligence

Cost has increased by ₹10 Cr (0.6%) from the original estimate of ₹1555 Cr.

Expenditure stands at ₹723 Cr, which is 46.2% of the revised project cost.

Remaining budget: ₹841 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1555.00 Cr, later revised to ₹1564.66 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Bar"?
6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹1555 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1555 Cr and has been revised to ₹1565 Cr — a cost overrun of +0.6%. Expenditure to date: ₹723 Cr (46.2% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
6L Access Controlled Ludhiana-Bathinda Greenfield highway fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619105. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Access Controlled Ludhiana-Bathinda Greenfield highway fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.