6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2
Original Cost
₹1555 Cr
Baseline estimate
Revised Cost
₹1565 Cr
Latest approved cost
Expenditure
₹723 Cr
Spent to date
Utilization
46.2%
Of revised budget
Cost Status
+0.6%
+₹10 Cr increase
Remaining
₹841 Cr
Budget left
Budget Utilization
46.2%Spent
₹723 Cr
Remaining
₹841 Cr
Total
₹1565 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1555 Cr
Revised Cost
₹1565 Cr
Increase
+₹10 Cr
Escalation
+0.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
29/09/2027
Revised Completion
29/09/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹10 Cr (0.6%) from the original estimate of ₹1555 Cr.
Expenditure stands at ₹723 Cr, which is 46.2% of the revised project cost.
Remaining budget: ₹841 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1555.00 Cr, later revised to ₹1564.66 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Bar"?
- 6L Access Controlled Ludhiana-Bathinda Greenfield highway from Jn. with Moga-Barnala Road NH-703 near village Tallewal to Jn. with Delhi-Katra Expressway NE-5 near Ludhiana village Ballowal from Km 30.300 to Km 75.543 of NH-754AD Pkg-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹1555 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1555 Cr and has been revised to ₹1565 Cr — a cost overrun of +0.6%. Expenditure to date: ₹723 Cr (46.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Access Controlled Ludhiana-Bathinda Greenfield highway fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619105. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Access Controlled Ludhiana-Bathinda Greenfield highway fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.