6L Access Controlled Greenfield Highway from Odulapalle Ch. 72000 to Nallacheruvu-palli Ch. 96300 of [NH-544G]Package-4
Original Cost
₹1059 Cr
Baseline estimate
Revised Cost
₹946 Cr
Latest approved cost
Expenditure
₹403 Cr
Spent to date
Utilization
42.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹543 Cr
Budget left
Budget Utilization
42.6%Spent
₹403 Cr
Remaining
₹543 Cr
Total
₹946 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/02/2026
Revised Completion
30/04/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1059 Cr — no cost escalation recorded.
Expenditure stands at ₹403 Cr, which is 42.6% of the revised project cost.
Remaining budget: ₹543 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Access Controlled Greenfield Highway from Odulapalle Ch. 72000 to Nallacheruvu-palli Ch. 96300 of [NH-544G]Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1059.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Access Controlled Greenfield Highway from Odulapalle Ch. 72000 to Nallacheruv"?
- 6L Access Controlled Greenfield Highway from Odulapalle Ch. 72000 to Nallacheruvu-palli Ch. 96300 of [NH-544G]Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹1059 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1059 Cr and has been revised to ₹946 Cr — a cost overrun of -10.7%. Expenditure to date: ₹403 Cr (42.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Access Controlled Greenfield Highway from Odulapalle Ch. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618715. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Access Controlled Greenfield Highway from Odulapalle Ch. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.