4LPS Access Controlled Highway of Bellary Bypass Balance work from Ch. 254750 to Ch. 266837 and construction of 4LPS from Ch. 277.690 to Ch. 278.690 at D. Hirehal Village Balance work of NH 150A of Bellary Byrapura Section
Original Cost
₹626 Cr
Baseline estimate
Revised Cost
₹284 Cr
Latest approved cost
Expenditure
₹126 Cr
Spent to date
Utilization
44.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹158 Cr
Budget left
Budget Utilization
44.4%Spent
₹126 Cr
Remaining
₹158 Cr
Total
₹284 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/07/2026
Revised Completion
02/11/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹626 Cr — no cost escalation recorded.
Expenditure stands at ₹126 Cr, which is 44.4% of the revised project cost.
Remaining budget: ₹158 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4LPS Access Controlled Highway of Bellary Bypass Balance work from Ch. 254750 to Ch. 266837 and construction of 4LPS from Ch. 277.690 to Ch. 278.690 at D. Hirehal Village Balance work of NH 150A of Bellary Byrapura Section is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹626.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4LPS Access Controlled Highway of Bellary Bypass Balance work from Ch. 254750 to"?
- 4LPS Access Controlled Highway of Bellary Bypass Balance work from Ch. 254750 to Ch. 266837 and construction of 4LPS from Ch. 277.690 to Ch. 278.690 at D. Hirehal Village Balance work of NH 150A of Bellary Byrapura Section is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹626 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹626 Cr and has been revised to ₹284 Cr — a cost overrun of -54.6%. Expenditure to date: ₹126 Cr (44.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4LPS Access Controlled Highway of Bellary Bypass Balance wor is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618697. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4LPS Access Controlled Highway of Bellary Bypass Balance wor is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.