Roads & HighwaysIPM · Central Project#618959

4L Prayagraj Greenfield By-pass from design Km 50860 near Nibi Kala Uperhar to design Km 64763 on NH-19 near Khodaypur Kasgaon including Interchange loop at NH-19

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹428 CrUtilization: 95.1%

Original Cost

₹1018 Cr

Baseline estimate

On budget

Revised Cost

₹428 Cr

Latest approved cost

Expenditure

₹407 Cr

Spent to date

Utilization

95.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹21 Cr

Budget left

Budget Utilization

95.1%
0%25%50%75%100%

Spent

₹407 Cr

Remaining

₹21 Cr

Total

₹428 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

26/03/2025

Revised Completion

Completed

Project Details

Project Code618959
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-05

Financial Summary

Original Cost₹1018 Cr
Revised Cost₹428 Cr
Expenditure₹407 Cr
Original End Date26/03/2025
Revised DateN/A

Project Intelligence

Project is within original budget of ₹1018 Cr — no cost escalation recorded.

Expenditure stands at ₹407 Cr, which is 95.1% of the revised project cost.

Remaining budget: ₹21 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L Prayagraj Greenfield By-pass from design Km 50860 near Nibi Kala Uperhar to design Km 64763 on NH-19 near Khodaypur Kasgaon including Interchange loop at NH-19 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1018.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L Prayagraj Greenfield By-pass from design Km 50860 near Nibi Kala Uperhar to d"?
4L Prayagraj Greenfield By-pass from design Km 50860 near Nibi Kala Uperhar to design Km 64763 on NH-19 near Khodaypur Kasgaon including Interchange loop at NH-19 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1018 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1018 Cr and has been revised to ₹428 Cr — a cost overrun of -58%. Expenditure to date: ₹407 Cr (95.1% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
4L Prayagraj Greenfield By-pass from design Km 50860 near Ni is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618959. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Prayagraj Greenfield By-pass from design Km 50860 near Ni is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.