Roads & HighwaysIPM · Central Project#618543

4L of twin tube tunnel configuration including approaches from Marog to Digdol from Km.154.210 to Km.158.650 North Bound and from Km.155.940 to Km.160.260 South Bound of Ramban to Banihal Pkg-I of Old NH-1A New NH-44

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹1034 CrUtilization: 41.1%

Original Cost

₹1912 Cr

Baseline estimate

On budget

Revised Cost

₹1034 Cr

Latest approved cost

Expenditure

₹425 Cr

Spent to date

Utilization

41.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹609 Cr

Budget left

Budget Utilization

41.1%
0%25%50%75%100%

Spent

₹425 Cr

Remaining

₹609 Cr

Total

₹1034 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

12/08/2025

Revised Completion

31/12/2027

Completed

Project Details

Project Code618543
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹1912 Cr
Revised Cost₹1034 Cr
Expenditure₹425 Cr
Original End Date12/08/2025
Revised Date31/12/2027

Project Intelligence

Project is within original budget of ₹1912 Cr — no cost escalation recorded.

Expenditure stands at ₹425 Cr, which is 41.1% of the revised project cost.

Remaining budget: ₹609 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L of twin tube tunnel configuration including approaches from Marog to Digdol from Km.154.210 to Km.158.650 North Bound and from Km.155.940 to Km.160.260 South Bound of Ramban to Banihal Pkg-I of Old NH-1A New NH-44 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1912.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L of twin tube tunnel configuration including approaches from Marog to Digdol f"?
4L of twin tube tunnel configuration including approaches from Marog to Digdol from Km.154.210 to Km.158.650 North Bound and from Km.155.940 to Km.160.260 South Bound of Ramban to Banihal Pkg-I of Old NH-1A New NH-44 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹1912 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1912 Cr and has been revised to ₹1034 Cr — a cost overrun of -45.9%. Expenditure to date: ₹425 Cr (41.1% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L of twin tube tunnel configuration including approaches fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618543. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of twin tube tunnel configuration including approaches fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.