4L of Moradabad western side spur connecting NH-734 & NH-24 from Km. 0.000 to Km. 33.200 Pkg-I
Original Cost
₹1842 Cr
Baseline estimate
Revised Cost
₹1844 Cr
Latest approved cost
Expenditure
₹1133 Cr
Spent to date
Utilization
61.5%
Of revised budget
Cost Status
+0.1%
+₹2 Cr increase
Remaining
₹710 Cr
Budget left
Budget Utilization
61.5%Spent
₹1133 Cr
Remaining
₹710 Cr
Total
₹1844 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1842 Cr
Revised Cost
₹1844 Cr
Increase
+₹2 Cr
Escalation
+0.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/09/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹2 Cr (0.1%) from the original estimate of ₹1842 Cr.
Expenditure stands at ₹1133 Cr, which is 61.5% of the revised project cost.
Remaining budget: ₹710 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of Moradabad western side spur connecting NH-734 & NH-24 from Km. 0.000 to Km. 33.200 Pkg-I is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1842.00 Cr, later revised to ₹1843.54 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of Moradabad western side spur connecting NH-734 & NH-24 from Km. 0.000 to Km"?
- 4L of Moradabad western side spur connecting NH-734 & NH-24 from Km. 0.000 to Km. 33.200 Pkg-I is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1842 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1842 Cr and has been revised to ₹1844 Cr — a cost overrun of +0.1%. Expenditure to date: ₹1133 Cr (61.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L of Moradabad western side spur connecting NH-734 & NH-24 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618929. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Moradabad western side spur connecting NH-734 & NH-24 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.