4L of left out existing road section from Lalgopalganj Km 161.450 to Nawabganj Km 180.200 in Prayagraj
Original Cost
₹160 Cr
Baseline estimate
Revised Cost
₹101 Cr
Latest approved cost
Expenditure
₹72 Cr
Spent to date
Utilization
71.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹28 Cr
Budget left
Budget Utilization
71.9%Spent
₹72 Cr
Remaining
₹28 Cr
Total
₹101 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2026
Revised Completion
30/06/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹160 Cr — no cost escalation recorded.
Expenditure stands at ₹72 Cr, which is 71.9% of the revised project cost.
Remaining budget: ₹28 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of left out existing road section from Lalgopalganj Km 161.450 to Nawabganj Km 180.200 in Prayagraj is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹160.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of left out existing road section from Lalgopalganj Km 161.450 to Nawabganj K"?
- 4L of left out existing road section from Lalgopalganj Km 161.450 to Nawabganj Km 180.200 in Prayagraj is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹160 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹160 Cr and has been revised to ₹101 Cr — a cost overrun of -37%. Expenditure to date: ₹72 Cr (71.9% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- 4L of left out existing road section from Lalgopalganj Km 16 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618755. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of left out existing road section from Lalgopalganj Km 16 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.