4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A
Original Cost
₹1149 Cr
Baseline estimate
Revised Cost
₹1607 Cr
Latest approved cost
Expenditure
₹938 Cr
Spent to date
Utilization
58.4%
Of revised budget
Cost Status
+39.9%
+₹458 Cr increase
Remaining
₹669 Cr
Budget left
Budget Utilization
58.4%Spent
₹938 Cr
Remaining
₹669 Cr
Total
₹1607 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1149 Cr
Revised Cost
₹1607 Cr
Increase
+₹458 Cr
Escalation
+39.9%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/05/2024
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹458 Cr (39.9%) from the original estimate of ₹1149 Cr.
Expenditure stands at ₹938 Cr, which is 58.4% of the revised project cost.
Remaining budget: ₹669 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1149.00 Cr, later revised to ₹1606.99 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.8"?
- 4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1149 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1149 Cr and has been revised to ₹1607 Cr — a cost overrun of +39.9%. Expenditure to date: ₹938 Cr (58.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Kh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618945. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Kh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.