Roads & HighwaysIPM · Central Project +39.9% overrun#618945

4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A

Ministry of Road Transport & HighwaysTelangana
Revised Cost: ₹1607 CrUtilization: 58.4%Overrun: +₹458 Cr

Original Cost

₹1149 Cr

Baseline estimate

+40% overrun

Revised Cost

₹1607 Cr

Latest approved cost

Expenditure

₹938 Cr

Spent to date

Utilization

58.4%

Of revised budget

Escalated

Cost Status

+39.9%

+₹458 Cr increase

Remaining

₹669 Cr

Budget left

Budget Utilization

58.4%
0%25%50%75%100%

Spent

₹938 Cr

Remaining

₹669 Cr

Total

₹1607 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1149 Cr

Revised Cost

₹1607 Cr

Increase

+₹458 Cr

Escalation

+39.9%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/05/2024

Revised Completion

30/09/2026

Completed

Project Details

Project Code618945
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTelangana
Data Month2026-08

Financial Summary

Original Cost₹1149 Cr
Revised Cost₹1607 Cr
Expenditure₹938 Cr
Original End Date31/05/2024
Revised Date30/09/2026

Project Intelligence

Cost has increased by ₹458 Cr (39.9%) from the original estimate of ₹1149 Cr.

Expenditure stands at ₹938 Cr, which is 58.4% of the revised project cost.

Remaining budget: ₹669 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1149.00 Cr, later revised to ₹1606.99 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.8"?
4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Khammam Design Km 31.800/Existing Km 29.400 of NH-365A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1149 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1149 Cr and has been revised to ₹1607 Cr — a cost overrun of +39.9%. Expenditure to date: ₹938 Cr (58.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Kh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618945. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Kodad Design Km 0.00/Existing Km 185.00 of NH-65 to Kh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.