4L of Haridwar Nagina section Design Ch. LME from km 13.829 to km 17.110 & km 26.077 to km 27.508 and Design Ch. RME from km 13.839 to km 17.120 & km 26.078 to km 27.509 of EUP mitigation measures on NH74
Original Cost
₹184 Cr
Baseline estimate
Revised Cost
₹142 Cr
Latest approved cost
Expenditure
₹120 Cr
Spent to date
Utilization
84.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹22 Cr
Budget left
Budget Utilization
84.2%Spent
₹120 Cr
Remaining
₹22 Cr
Total
₹142 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/02/2024
Revised Completion
30/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹184 Cr — no cost escalation recorded.
Expenditure stands at ₹120 Cr, which is 84.2% of the revised project cost.
Remaining budget: ₹22 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of Haridwar Nagina section Design Ch. LME from km 13.829 to km 17.110 & km 26.077 to km 27.508 and Design Ch. RME from km 13.839 to km 17.120 & km 26.078 to km 27.509 of EUP mitigation measures on NH74 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹184.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of Haridwar Nagina section Design Ch. LME from km 13.829 to km 17.110 & km 2"?
- 4L of Haridwar Nagina section Design Ch. LME from km 13.829 to km 17.110 & km 26.077 to km 27.508 and Design Ch. RME from km 13.839 to km 17.120 & km 26.078 to km 27.509 of EUP mitigation measures on NH74 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹184 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹184 Cr and has been revised to ₹142 Cr — a cost overrun of -22.8%. Expenditure to date: ₹120 Cr (84.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L of Haridwar Nagina section Design Ch. LME from km 13.829 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618875. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Haridwar Nagina section Design Ch. LME from km 13.829 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.