4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166.400 to Km 220.900 of Mohol Alandi section of NH-965 Pkg - V
Original Cost
₹1710 Cr
Baseline estimate
Revised Cost
₹2050 Cr
Latest approved cost
Expenditure
₹1126 Cr
Spent to date
Utilization
54.9%
Of revised budget
Cost Status
+19.9%
+₹340 Cr increase
Remaining
₹924 Cr
Budget left
Budget Utilization
54.9%Spent
₹1126 Cr
Remaining
₹924 Cr
Total
₹2050 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1710 Cr
Revised Cost
₹2050 Cr
Increase
+₹340 Cr
Escalation
+19.9%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/05/2024
Revised Completion
30/04/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹340 Cr (19.9%) from the original estimate of ₹1710 Cr.
Expenditure stands at ₹1126 Cr, which is 54.9% of the revised project cost.
Remaining budget: ₹924 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166.400 to Km 220.900 of Mohol Alandi section of NH-965 Pkg - V is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1710.00 Cr, later revised to ₹2049.51 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166.400 to Km 220.900 "?
- 4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166.400 to Km 220.900 of Mohol Alandi section of NH-965 Pkg - V is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹1710 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1710 Cr and has been revised to ₹2050 Cr — a cost overrun of +19.9%. Expenditure to date: ₹1126 Cr (54.9% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- 4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619209. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of existing 2/4L stretch from Lonand to Dive Ghat Km 166 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.