Roads & HighwaysIPM · Central Project#618911

4L Greenfield Western Side spur of Rampur-Rudrapur Section from Km 0.000 to Km 13.700 connecting NH-24 to NH-87 bypassing rampur town

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹638 CrUtilization: 58.0%

Original Cost

₹646 Cr

Baseline estimate

On budget

Revised Cost

₹638 Cr

Latest approved cost

Expenditure

₹370 Cr

Spent to date

Utilization

58.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹268 Cr

Budget left

Budget Utilization

58.0%
0%25%50%75%100%

Spent

₹370 Cr

Remaining

₹268 Cr

Total

₹638 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/11/2024

Revised Completion

28/02/2027

Completed

Project Details

Project Code618911
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹646 Cr
Revised Cost₹638 Cr
Expenditure₹370 Cr
Original End Date02/11/2024
Revised Date28/02/2027

Project Intelligence

Project is within original budget of ₹646 Cr — no cost escalation recorded.

Expenditure stands at ₹370 Cr, which is 58.0% of the revised project cost.

Remaining budget: ₹268 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L Greenfield Western Side spur of Rampur-Rudrapur Section from Km 0.000 to Km 13.700 connecting NH-24 to NH-87 bypassing rampur town is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹646.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L Greenfield Western Side spur of Rampur-Rudrapur Section from Km 0.000 to Km 1"?
4L Greenfield Western Side spur of Rampur-Rudrapur Section from Km 0.000 to Km 13.700 connecting NH-24 to NH-87 bypassing rampur town is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹646 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹646 Cr and has been revised to ₹638 Cr — a cost overrun of -1.3%. Expenditure to date: ₹370 Cr (58.0% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L Greenfield Western Side spur of Rampur-Rudrapur Section f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618911. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Greenfield Western Side spur of Rampur-Rudrapur Section f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.