4L Access Controlled Greenfield Section Mancherial Warangal from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km Package-I
Original Cost
₹1128 Cr
Baseline estimate
Revised Cost
₹1104 Cr
Latest approved cost
Expenditure
₹162 Cr
Spent to date
Utilization
14.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹942 Cr
Budget left
Budget Utilization
14.7%Spent
₹162 Cr
Remaining
₹942 Cr
Total
₹1104 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
22/12/2026
Revised Completion
31/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1128 Cr — no cost escalation recorded.
Expenditure stands at ₹162 Cr, which is 14.7% of the revised project cost.
Remaining budget: ₹942 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L Access Controlled Greenfield Section Mancherial Warangal from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km Package-I is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1128.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L Access Controlled Greenfield Section Mancherial Warangal from Narva village "?
- 4L Access Controlled Greenfield Section Mancherial Warangal from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km Package-I is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1128 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1128 Cr and has been revised to ₹1104 Cr — a cost overrun of -2.1%. Expenditure to date: ₹162 Cr (14.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L Access Controlled Greenfield Section Mancherial Warangal is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618813. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Access Controlled Greenfield Section Mancherial Warangal is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.