4-Laning of Vairengte - Chhimluang section Package-3 of NH-306 from Existing Chainage km 43000 to Km 59700 Design Chainage km 46000 to km 60850 on Silchar - Vairengte- Sairang road in the State of Mizoram under Bharatmala Pariyojna under NHO-NE. Package-1&2 in Assam state
Original Cost
₹491 Cr
Baseline estimate
Revised Cost
₹491 Cr
Latest approved cost
Expenditure
₹245 Cr
Spent to date
Utilization
49.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹246 Cr
Budget left
Budget Utilization
49.9%Spent
₹245 Cr
Remaining
₹246 Cr
Total
₹491 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/01/2027
Revised Completion
30/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹491 Cr — no cost escalation recorded.
Expenditure stands at ₹245 Cr, which is 49.9% of the revised project cost.
Remaining budget: ₹246 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4-Laning of Vairengte - Chhimluang section Package-3 of NH-306 from Existing Chainage km 43000 to Km 59700 Design Chainage km 46000 to km 60850 on Silchar - Vairengte- Sairang road in the State of Mizoram under Bharatmala Pariyojna under NHO-NE. Package-1&2 in Assam state is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹491.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4-Laning of Vairengte - Chhimluang section Package-3 of NH-306 from Existing Ch"?
- 4-Laning of Vairengte - Chhimluang section Package-3 of NH-306 from Existing Chainage km 43000 to Km 59700 Design Chainage km 46000 to km 60850 on Silchar - Vairengte- Sairang road in the State of Mizoram under Bharatmala Pariyojna under NHO-NE. Package-1&2 in Assam state is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹491 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹491 Cr has not been significantly revised. Expenditure: ₹245 Cr (49.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4-Laning of Vairengte - Chhimluang section Package-3 of NH- is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618316. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Vairengte - Chhimluang section Package-3 of NH- is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.