4-Laning of Silchar - Dhanehari section from Existing Chainage km 263800 of NH 37 to km 12920 of NH 306 Design Chainage km 0000 to km 20000 on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode Package-1
Original Cost
₹1257 Cr
Baseline estimate
Revised Cost
₹1257 Cr
Latest approved cost
Expenditure
₹636 Cr
Spent to date
Utilization
50.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹621 Cr
Budget left
Budget Utilization
50.6%Spent
₹636 Cr
Remaining
₹621 Cr
Total
₹1257 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/07/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1257 Cr — no cost escalation recorded.
Expenditure stands at ₹636 Cr, which is 50.6% of the revised project cost.
Remaining budget: ₹621 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4-Laning of Silchar - Dhanehari section from Existing Chainage km 263800 of NH 37 to km 12920 of NH 306 Design Chainage km 0000 to km 20000 on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1257.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4-Laning of Silchar - Dhanehari section from Existing Chainage km 263800 of NH 3"?
- 4-Laning of Silchar - Dhanehari section from Existing Chainage km 263800 of NH 37 to km 12920 of NH 306 Design Chainage km 0000 to km 20000 on Silchar - Vairengte - Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1257 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1257 Cr has not been significantly revised. Expenditure: ₹636 Cr (50.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4-Laning of Silchar - Dhanehari section from Existing Chaina is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618315. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Silchar - Dhanehari section from Existing Chaina is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.