Roads & HighwaysIPM · Central Project#618319

4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 from Existing Chainage km 107850 to km 126315 Design Chainage km 95500 to km 111850 on Silchar-Vairengte- Sairang road, Vairengte - Sairang Pkg-6

Ministry of Road Transport & HighwaysMizoram
Revised Cost: ₹596 CrUtilization: 31.8%

Original Cost

₹596 Cr

Baseline estimate

On budget

Revised Cost

₹596 Cr

Latest approved cost

Expenditure

₹189 Cr

Spent to date

Utilization

31.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹407 Cr

Budget left

Budget Utilization

31.8%
0%25%50%75%100%

Spent

₹189 Cr

Remaining

₹407 Cr

Total

₹596 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

07/01/2027

Revised Completion

30/12/2026

Completed

Project Details

Project Code618319
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-08

Financial Summary

Original Cost₹596 Cr
Revised Cost₹596 Cr
Expenditure₹189 Cr
Original End Date07/01/2027
Revised Date30/12/2026

Project Intelligence

Project is within original budget of ₹596 Cr — no cost escalation recorded.

Expenditure stands at ₹189 Cr, which is 31.8% of the revised project cost.

Remaining budget: ₹407 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 from Existing Chainage km 107850 to km 126315 Design Chainage km 95500 to km 111850 on Silchar-Vairengte- Sairang road, Vairengte - Sairang Pkg-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹596.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 from Existing Chainag"?
4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 from Existing Chainage km 107850 to km 126315 Design Chainage km 95500 to km 111850 on Silchar-Vairengte- Sairang road, Vairengte - Sairang Pkg-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹596 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹596 Cr has not been significantly revised. Expenditure: ₹189 Cr (31.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618319. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Sethawn - N. Kawnpui section Package-6 of NH-6 f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.