Roads & HighwaysIPM · Central Project#618318

4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5

Ministry of Road Transport & HighwaysMizoram
Revised Cost: ₹720 CrUtilization: 36.1%

Original Cost

₹720 Cr

Baseline estimate

On budget

Revised Cost

₹720 Cr

Latest approved cost

Expenditure

₹260 Cr

Spent to date

Utilization

36.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹460 Cr

Budget left

Budget Utilization

36.1%
0%25%50%75%100%

Spent

₹260 Cr

Remaining

₹460 Cr

Total

₹720 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

07/07/2027

Revised Completion

28/06/2027

Completed

Project Details

Project Code618318
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-08

Financial Summary

Original Cost₹720 Cr
Revised Cost₹720 Cr
Expenditure₹260 Cr
Original End Date07/07/2027
Revised Date28/06/2027

Project Intelligence

Project is within original budget of ₹720 Cr — no cost escalation recorded.

Expenditure stands at ₹260 Cr, which is 36.1% of the revised project cost.

Remaining budget: ₹460 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹720.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage k"?
4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹720 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹720 Cr has not been significantly revised. Expenditure: ₹260 Cr (36.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618318. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.