4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5
Original Cost
₹720 Cr
Baseline estimate
Revised Cost
₹720 Cr
Latest approved cost
Expenditure
₹260 Cr
Spent to date
Utilization
36.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹460 Cr
Budget left
Budget Utilization
36.1%Spent
₹260 Cr
Remaining
₹460 Cr
Total
₹720 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/07/2027
Revised Completion
28/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹720 Cr — no cost escalation recorded.
Expenditure stands at ₹260 Cr, which is 36.1% of the revised project cost.
Remaining budget: ₹460 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹720.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage k"?
- 4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from Existing Chainage km 86000 to km 107850 Design Chainage km 77500 to km 95500 on silchar - vairengte - sairang road under Bharatmala Pariyojna on EPC mode under NHO-NE Vairengte - Sairang Pkg-5 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹720 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹720 Cr has not been significantly revised. Expenditure: ₹260 Cr (36.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618318. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Kolasib - Sethawn section Package-5 of NH-6 from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.