Roads & HighwaysIPM · Central Project#618314

4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 12920 to km 43000 of NH 306 Design Chainage km 20000 to km 49360 on Silchar - Vairengte Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. Project Length 29.360 km under NHO-NE Package-2

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹1716 CrUtilization: 61.6%

Original Cost

₹1716 Cr

Baseline estimate

On budget

Revised Cost

₹1716 Cr

Latest approved cost

Expenditure

₹1058 Cr

Spent to date

Utilization

61.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹658 Cr

Budget left

Budget Utilization

61.6%
0%25%50%75%100%

Spent

₹1058 Cr

Remaining

₹658 Cr

Total

₹1716 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

14/08/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code618314
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹1716 Cr
Revised Cost₹1716 Cr
Expenditure₹1058 Cr
Original End Date14/08/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹1716 Cr — no cost escalation recorded.

Expenditure stands at ₹1058 Cr, which is 61.6% of the revised project cost.

Remaining budget: ₹658 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 12920 to km 43000 of NH 306 Design Chainage km 20000 to km 49360 on Silchar - Vairengte Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. Project Length 29.360 km under NHO-NE Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1716.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 129"?
4-Laning of Dhanehari Lailapur / Vairengte section from Existing Chainage km 12920 to km 43000 of NH 306 Design Chainage km 20000 to km 49360 on Silchar - Vairengte Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. Project Length 29.360 km under NHO-NE Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1716 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1716 Cr has not been significantly revised. Expenditure: ₹1058 Cr (61.6% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4-Laning of Dhanehari Lailapur / Vairengte section from Exis is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618314. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-Laning of Dhanehari Lailapur / Vairengte section from Exis is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.