4 laning of Aligarh-Palwal Section from Km. 46.390 Design Chainage to Km. 69.110 Terminating at junction EPE Package-II from Kurana- Eastern Peripheral Expressway of NH-334D

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹904 CrUtilization: 30.6%

Original Cost

₹939 Cr

Baseline estimate

On budget

Revised Cost

₹904 Cr

Latest approved cost

Expenditure

₹277 Cr

Spent to date

Utilization

30.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹627 Cr

Budget left

Budget Utilization

30.6%
0%25%50%75%100%

Spent

₹277 Cr

Remaining

₹627 Cr

Total

₹904 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

26/08/2027

Revised Completion

27/08/2027

Completed

Project Details

Project Code618691
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹939 Cr
Revised Cost₹904 Cr
Expenditure₹277 Cr
Original End Date26/08/2027
Revised Date27/08/2027

Project Intelligence

Project is within original budget of ₹939 Cr — no cost escalation recorded.

Expenditure stands at ₹277 Cr, which is 30.6% of the revised project cost.

Remaining budget: ₹627 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4 laning of Aligarh-Palwal Section from Km. 46.390 Design Chainage to Km. 69.110 Terminating at junction EPE Package-II from Kurana- Eastern Peripheral Expressway of NH-334D is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹939.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4 laning of Aligarh-Palwal Section from Km. 46.390 Design Chainage to Km. 69.110"?
4 laning of Aligarh-Palwal Section from Km. 46.390 Design Chainage to Km. 69.110 Terminating at junction EPE Package-II from Kurana- Eastern Peripheral Expressway of NH-334D is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹939 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹939 Cr and has been revised to ₹904 Cr — a cost overrun of -3.7%. Expenditure to date: ₹277 Cr (30.6% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4 laning of Aligarh-Palwal Section from Km. 46.390 Design Ch is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618691. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4 laning of Aligarh-Palwal Section from Km. 46.390 Design Ch is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.