Roads & HighwaysIPM · Central Project#618649

4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raichur Section of NH 748 A Package-6

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹1013 CrUtilization: 40.8%

Original Cost

₹1246 Cr

Baseline estimate

On budget

Revised Cost

₹1013 Cr

Latest approved cost

Expenditure

₹413 Cr

Spent to date

Utilization

40.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹600 Cr

Budget left

Budget Utilization

40.8%
0%25%50%75%100%

Spent

₹413 Cr

Remaining

₹600 Cr

Total

₹1013 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/11/2026

Revised Completion

30/06/2027

Completed

Project Details

Project Code618649
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹1246 Cr
Revised Cost₹1013 Cr
Expenditure₹413 Cr
Original End Date20/11/2026
Revised Date30/06/2027

Project Intelligence

Project is within original budget of ₹1246 Cr — no cost escalation recorded.

Expenditure stands at ₹413 Cr, which is 40.8% of the revised project cost.

Remaining budget: ₹600 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raichur Section of NH 748 A Package-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1246.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raic"?
4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raichur Section of NH 748 A Package-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹1246 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1246 Cr and has been revised to ₹1013 Cr — a cost overrun of -18.7%. Expenditure to date: ₹413 Cr (40.8% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618649. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.