Original Cost
₹1246 Cr
Baseline estimate
Revised Cost
₹1013 Cr
Latest approved cost
Expenditure
₹413 Cr
Spent to date
Utilization
40.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹600 Cr
Budget left
Budget Utilization
40.8%Spent
₹413 Cr
Remaining
₹600 Cr
Total
₹1013 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/11/2026
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1246 Cr — no cost escalation recorded.
Expenditure stands at ₹413 Cr, which is 40.8% of the revised project cost.
Remaining budget: ₹600 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raichur Section of NH 748 A Package-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1246.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raic"?
- 4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of Belgaum-Hungund-Raichur Section of NH 748 A Package-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹1246 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1246 Cr and has been revised to ₹1013 Cr — a cost overrun of -18.7%. Expenditure to date: ₹413 Cr (40.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618649. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4 Lane with PS from Des. Ch 228.500 to Des. Ch. 273.400 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.