Environmental ClearanceForest Clearance

Improvement and Upgrading from Intermediate Lane to 2-Lane with Paved Shoulder Configuration of SH-97, Bishanpur-Attarbel-Jale-Ghoghrahachatti from Design Km 0+000 to Km 47+905 (Project Design Length = 47.905 Km) in the State of Bihar.

Darbhanga, BiharBIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED
Proposal no.FP/BR/ROAD/584340/2026

Current status

Pending at UA due to EDS by MS after PSC-I
  1. SubmittedApplication filed on PARIVESH
  2. VerificationChecked for completeness
  3. 3ExaminationNowScrutiny; shortfalls raised as EDS
  4. 4Expert appraisalAppraised by the expert committee (SEAC/EAC)
  5. 5DecisionClearance granted or refused

Updated 6 Oct 2026

Project cost
₹4.20 Cr
As filed on PARIVESH
Land required
—
Total project area
Submitted
21 Aug 2026
Filed on PARIVESH
Documents
3
PDF & KML files

About this proposal

Overview

Improvement and Upgrading from Intermediate Lane to 2-Lane with Paved Shoulder Configuration of SH-97, Bishanpur-Attarbel-Jale-Ghoghrahachatti from Design Km 0+000 to Km 47+905 (Project Design Length = 47.905 Km) in the State of Bihar. is a Forest Clearance (FC) proposal filed under India's PARIVESH portal, tracked here as part of BiharInfraTales' Bihar clearance monitoring dashboard. The proposal (reference number FP/BR/ROAD/584340/2026) was submitted by Pawan Kumar on behalf of BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED in Darbhanga, Bihar, with an estimated project cost of ₹4.2 crore.

The proposal falls under the Forestry / Linear sector and currently carries the status "Pending at UA due to EDS by MS after PSC-I". Forest Clearance is required under the Forest (Conservation) Act for diversion of forest land for non-forest infrastructure and development purposes, governed by the Ministry of Environment, Forest and Climate Change (MoEFCC) and state forest departments.

The application was submitted on 2026-08-21. The land requirement comprises 0 ha of forest land and 0 ha of non-forest land. Full proposal documents, boundary (KML) data, and the exact project location, where published by PARIVESH, are linked on this page. This record is updated as the clearance moves through verification, appraisal, and the final grant or rejection stage.

PARIVESH data

Proposal record

11 fields
Proposal Number
FP/BR/ROAD/584340/2026
Organisation
BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED
Applicant
Pawan Kumar
Clearance Type
Forest Clearance
Proposal Type
FC
Current Status
Pending at UA due to EDS by MS after PSC-I
Submission Date
2026-08-21
Nodal Accepted Date
21-AUG-2026
Shape of Project
Linear
Forest Land
0 Ha
Non-Forest Land
0 Ha

Where

Project location

2 fields
District
Darbhanga
State
Bihar

Source files

Documents & boundary data

3 files

Data from the Government of India's PARIVESH environmental clearance portal.

Questions

Frequently asked questions

1What is the Environmental Clearance status of "Improvement and Upgrading from Intermediate Lane to 2-Lane with Paved Shoulder C"?

As per the latest PARIVESH data, proposal FP/BR/ROAD/584340/2026 carries the status "Pending at UA due to EDS by MS after PSC-I". It is a infrastructure-sector project in Darbhanga, Bihar.

2Who is the applicant for this Environmental Clearance proposal?

The proposal was filed by Pawan Kumar on behalf of BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED. The clearance type is Forest Clearance and it is tracked under PARIVESH reference FP/BR/ROAD/584340/2026.

3What is the project cost and land requirement?

The proposal reports an estimated cost of ₹4.20 Cr (0 ha forest, 0 ha non-forest).

4What is Environmental Clearance (EC) and why does this project need it?

Environmental Clearance is a mandatory approval under India's Environment Impact Assessment (EIA) framework, granted by the MoEFCC or the State Environment Impact Assessment Authority (SEIAA) via the PARIVESH portal. Projects that can significantly affect the environment must obtain EC — covering appraisal of pollution, land use, and ecological impact — before construction or expansion can lawfully begin.