Development of Newly declared NH-727AA to 2/4- Lane Standard Highway from Bettiah on NH-727 connecting Patzirwa, Paknaha in the state of Bihar, Pipraghat and terminate at Sewrahi Jn. with NH- 730 in the state of Uttar Pradesh (Total design length = 29.220 km)

Pashchim Champaran, BiharRam MOHAN singh
Proposal no.FP/BR/OTHERS/580381/2026

Current status

Delisted_by_system
  1. SubmittedApplication filed on PARIVESH
  2. VerificationChecked for completeness
  3. ExaminationScrutiny; shortfalls raised as EDS
  4. Expert appraisalAppraised by the expert committee (SEAC/EAC)
  5. ClosedReturned, withdrawn, delisted or refused

Updated 6 Oct 2026

Project cost
₹3,175 Cr
As filed on PARIVESH
Land required
182.97 Ha
Total project area
Submitted
28 May 2026
Filed on PARIVESH
Documents
3
PDF & KML files

About this proposal

Overview

Development of Newly declared NH-727AA to 2/4- Lane Standard Highway from Bettiah on NH-727 connecting Patzirwa, Paknaha in the state of Bihar, Pipraghat and terminate at Sewrahi Jn. with NH- 730 in the state of Uttar Pradesh (Total design length = 29.220 km) is a Forest Clearance (FC) proposal filed under India's PARIVESH portal, tracked here as part of BiharInfraTales' Bihar clearance monitoring dashboard. The proposal (reference number FP/BR/OTHERS/580381/2026) was submitted by Ram Mohan Singh on behalf of Ram MOHAN singh in Pashchim Champaran, Bihar, with an estimated project cost of ₹3,175.22 crore spread over 182.97 hectares.

The proposal falls under the Forestry / Linear sector and currently carries the status "Delisted_by_system". Forest Clearance is required under the Forest (Conservation) Act for diversion of forest land for non-forest infrastructure and development purposes, governed by the Ministry of Environment, Forest and Climate Change (MoEFCC) and state forest departments.

The application was submitted on 2026-05-28. The land requirement comprises 0.3297 ha of forest land and 182.6403 ha of non-forest land. Full proposal documents, boundary (KML) data, and the exact project location, where published by PARIVESH, are linked on this page. This record is updated as the clearance moves through verification, appraisal, and the final grant or rejection stage.

PARIVESH data

Proposal record

11 fields
Proposal Number
FP/BR/OTHERS/580381/2026
Organisation
Ram MOHAN singh
Applicant
Ram Mohan Singh
Clearance Type
Forest Clearance
Proposal Type
FC
Current Status
Delisted_by_system
Submission Date
2026-05-28
Nodal Accepted Date
28-MAY-2026
Shape of Project
Linear
Forest Land
0.3297 Ha
Non-Forest Land
182.6403 Ha

Where

Project location

3 fields
District
Pashchim Champaran
State
Bihar
Total Land Area
182.97 Ha

Source files

Documents & boundary data

3 files

Data from the Government of India's PARIVESH environmental clearance portal.

Questions

Frequently asked questions

1What is the Environmental Clearance status of "Development of Newly declared NH-727AA to 2/4- Lane Standard Highway from Bettia"?

As per the latest PARIVESH data, proposal FP/BR/OTHERS/580381/2026 carries the status "Delisted_by_system". It is a infrastructure-sector project in Pashchim Champaran, Bihar.

2Who is the applicant for this Environmental Clearance proposal?

The proposal was filed by Ram Mohan Singh on behalf of Ram MOHAN singh. The clearance type is Forest Clearance and it is tracked under PARIVESH reference FP/BR/OTHERS/580381/2026.

3What is the project cost and land requirement?

The proposal reports an estimated cost of ₹3,175 Cr and requires 182.97 Ha of land (0.3297 ha forest, 182.6403 ha non-forest).

4What is Environmental Clearance (EC) and why does this project need it?

Environmental Clearance is a mandatory approval under India's Environment Impact Assessment (EIA) framework, granted by the MoEFCC or the State Environment Impact Assessment Authority (SEIAA) via the PARIVESH portal. Projects that can significantly affect the environment must obtain EC — covering appraisal of pollution, land use, and ecological impact — before construction or expansion can lawfully begin.