Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Vendor Directory

Vendors from Bihar

251 MCA-registered companies executing 637 Bihar government infrastructure projects.

Vendors

251

Bihar Projects

637

Total Contract Value

₹33482.78 Cr

Avg. Projects / Vendor

2.5

JC
U45200BR2009PTC014867· Registered 2009-09-23
Private Company limited by shares ₹3.70 Cr paid-up ROC Patna

17 Bihar Projects

11. A.E. WORK AT POKHARIYA MUSAHARI TOLA ON THE LEFT BANK OF GANDAK RIVER NEAR CHAMPARAN EMBANKMENT 52.35KM TO 52.85KM. 2. A.E. WORK AT PUJAHA QABRISTAN LEFT BANK OF GANDAK RIVER AT 42.30 KM OF CHAMPARAN EMBANKMENT. (NEW AGENDA NO- 212/09/2024).(OLD AGENDA NO. 211/73/2024) GR-01 Pashchim Champaran ₹3.07 Cr2ANTI-EROSION WORK VILLAGE- BABLABANNA BLACK- AMDABAD, DIST.-KATIHAR. ALONG THE LEFT EDGE OF RIVER GANGAAGENDA NO:-211/426/2024) UNDER FLOOD CONTROL DIVISION, KATIHAR. Katihar ₹16.08 Cr3AE Work Between 09.80 km to 11.30 km of Sallehpur Tandaspur Chharki and at offshoot of Gandak River in front of Sallehpur Tandaspur Chharki in between 10.30 km to 11.00 km and in between km 84.20 of Saran Embankment (Munja Corner) to km 0.250 km of Matiyari Ring bundh (Agenda No:- 220/169/2025, 220/170/2025, 220/173/2025) Saran ₹6.96 Cr4Removal of obstacles for continuous flow of the Sursar river in Chhatapur and Triveniganj block under Supaul District Supaul ₹3.93 Cr5Desilting, Channelization and Beautification of Ramzan River Block-Kishanganj, Dist-Kishanganj (Agenda No- 224/11/2025) Kishanganj ₹8.57 Cr6Repair of Road from Kosi I.B. to Burma Shell and Physical Modelling Centre (PMC) to Airport Birpur Supaul ₹3.28 Cr7A.E.Work for (1 ) Protection of D/S shank and revetment of spur 8 ( 2 ) Protection of revetment at U/S and D/S of sp-9 (3) Anti erosion work for removel of shoal infront of Sp-7 to Sp-8 under fcd, naugachia. AGENDA NO 211/444/2024 AND 211/445/2024 Bhagalpur ₹5.91 Cr8A.E WORK AT KARHAN VILLAGE NEAR WARD NO 9 & 10.(AGENDA NO- 211/67/2024). GR01 Purba Champaran ₹6.93 Cr9Ranovation of Murliganj Branch Canal from RD 0.00 to RD 69.00 under Irrigation Division Triveniganj Supaul ₹9.97 Cr10AE work for AE work for restoration of (i) Revetment between Spur-8 & Spur-9 and (ii) Anti erosion work from spur-9 to ferry Ghat . (Agenda no.- 220/466/2025) Bhagalpur ₹16.09 Cr11Anti Erosion work at Hajipur Wajidpur embankment from Km 58.61 to km 61.01 on the left River Ganga before flood 2025.(Agenda No:- 220/246/2025) Samastipur ₹9.52 Cr12A.E. Work on Left Bank of River Ganga from Balitola to Sabalpur Pachhiyari Tola (Agenda No. 220/158/2025) Saran ₹4.48 Cr13A.E Work Near Village Kutlupur Haribabu Singh tola (ward no- 4,6,7) and tagging with existing A.E Work near Village Sheonagar purana dih Infront of Km 12.50 to Km 13.50 of Sanha Gorgama Embankment.(Agenda No-220/286/2025) Begusarai ₹12.21 Cr14A.E. at North Bahorwa Village in front of km 13.00 to 14.00 of K.B Embankment(Agenda No-220/323/2025) Khagaria ₹4.74 Cr15Anti Erosion work at Ganiyari Village of left bank of left Edge of River Ganga. (Agenda No.-242/63/2026) Vaishali ₹57.19 Cr16A.E Work between KM. 10.82 to km. 0.00 of Dalwa Ring Bundh of WKE. (AGENDA NO. WKE/B/07/2024) Supaul ₹11.21 Cr17A.E. WORK IN BETWEEN KM. 0.00 TO 1.60 KM OF BAGDOV BARSOI MAHANANDA RIGHT EMBANKMENT (BBMRE) AND RESTORATION OF OLD A.E. WORK AT SHIKARPUR VILLAGE (Agenda No.- 220/549/2025) Katihar ₹4.53 Cr
View full company profile →
BB
U45200BR2017PTC035982· Registered 2017-10-11
Private Company limited by shares ₹6.00 Cr paid-up ROC Patna

17 Bihar Projects

1CONSTRUCTION OF GANGA JAL PARIYOJANA O.P. BUILDING (G+2) IN THE DISTRICT OF NALANDA - WITH ELECTRIFICATION Nalanda ₹3.97 Cr2CONSTRUCTION OF BYPASS TRAFFIC THANA BUILDING (G+4 STRUCTURE) WITH ELECTRIFICATION AT PATNA IN THE DISTRICT OF PATNA Patna ₹3.96 Cr3CONSTRUCTION OF RAIL THANA BUILDING (G+4 STRUCTURE) AT PATNA RAILWAY STATION IN THE DISTRICT OF PATNA WITH ELECTRIFICATION Patna ₹4.43 Cr4CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT GULNI AND DHATROL PANCHAYAT, BLOCK- PAKRIBARAWAN, NAWADA FOR THE YEAR 2024-2025. Nawada ₹5.34 Cr5CONSTRUCTION OF MODEL POLICE STATION BUILDING, OUT HOUSE WITH ELECTRIFICATION AT KANKARBAGH POLICE STATION IN THE DISTRICT OF PATNA Patna ₹4.45 Cr6CONSTRUCTION OF POLICE STATION BUILDING (G+3 STRUCTURE), OUT HOUSE WITH ELECTRIFICATION AT DIDARGANJ POLICE STATION IN THE DISTRICT OF PATNA Patna ₹4.62 Cr7CONSTRUCTION OF MUSALLPUR POLICE STATION (MODEL POLICE STATION) IN THE DISTRICT OF PATNA - WITH ELECTRIFICATION Patna ₹5.27 Cr8CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT KATRI, BILLARI & KATAUNA PANCHYAT UNDER KATRISARAI BLOCK IN DIST:- NALANDA Nalanda ₹7.93 Cr9CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT BARNAMA,PANGRI AND SAUR PANCHAYAT BLOCK- WARSALIGANJ, NAWADA FOR THE YEAR 2024-2025. Nawada ₹8.01 Cr10CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT DOSUT, APSAD, SHAHPUR AND MOUSMA PANCHAYAT, BLOCK- WARISALIGANJ, NAWADA FOR THE YEAR 2024-2025. Nawada ₹10.59 Cr11CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT KEVALI ,PALI,DARAWA AND SEKHODEWRA PANCHAYAT BLOCK- KAUWAKOL, NAWADA FOR THE YEAR 2024-2025. Nawada ₹10.82 Cr12CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT KHAKRI, REWARA JAGDISHPUR, CHANDINAWA, PARVATI AND BIRNAWA PANCHAY AT BLOCK- KASHICHAK, NAWADA FOR THE YEAR 2024-2025. Nawada ₹13.24 Cr13STRUCTION OF CENTRALIZED KITCHEN CUM DINNING BLOCK, 4 NUMBER WATCH TOWER AND MAIN GATE WITH ELECTRIFICATION AT NEW POLICE LINE PATNA IN THE DISTRICT OF PATNA (Remaining Work) Patna ₹18.43 Cr14CONSTRUCTION OF 700 MALE CONSTABLE BARRACK BLOCK-A,B&C WITH ELECTRIFICATION AT NEW POLICE LINE PATNA IN THE DISTRICT OF PATNA (Remaining Work) Patna ₹39.75 Cr15CONSTRUCTION OF BLOCK -CUM- CIRCLE OFFICE BUILDING AT RAJAULI NAWADA. FY- 2025-26 Nawada ₹11.71 Cr16Construction of Block-cum-circle office building at Akbarpur, Nawada. Nawada ₹11.04 Cr17Construction Of 100 Bedded Rajkiya kalyan Hostel at Kuhila,Block- Akbarpur in the Distt. Of Nawada, Bihar. 2025-26 Nawada ₹4.63 Cr
View full company profile →
JM
U00739BR1995PTC006730· Registered 1995-09-20
Private Company limited by shares ₹9.67 L paid-up ROC Patna

17 Bihar Projects

1Construction of 02 (Two) Nos. PANCHAYAT SARKAR BHAWAN at Madhopur and Kasdewara Panchayat in Maharajganj Block in District- Siwan Siwan ₹5.27 Cr2Construction of 03 (Three) Nos. Panchayat Sarkar Bhawan at Cheeetakhal, Biswar and Sonahula Panchayat in Guthni Block in District- Siwan Siwan ₹7.44 Cr3Construction of 03 (Three) Nos. Panchayat Sarkar Bhawan at Gangpur Siswan, Siswa Kala and Rampur Panchayat in Siswan Block in District- Siwan Siwan ₹7.69 Cr4Construction of 04 (Four) Nos. PANCHAYAT SARKAR BHAWAN at Karsar, Khujwa, Kushahara and Baruwa Panchayat in Raghunathpur Block in District- Siwan Siwan ₹9.79 Cr5Construction of 04 no. (Four Units) of Panchayat Sarkar Bhawan in (1) Bhauradah Panchayat (2) Laucha Panchayat (3) Natuapada Panchayat (4) Chandwar Panchayat at Block- Bahadurganj of District- Kishanganj for the year - 2024-25. Kishanganj ₹11.36 Cr6Construction of 04 no. (Four Units) of Panchayat Sarkar Bhawan in (1) Gadgaon Panchayat (2) Kathamatha Panchayat (3) Kamalpur Panchayat (4) Majgama Panchayat at Block- Kochadhaman of District- Kishanganj for the year - 2024-25. Kishanganj ₹11.43 Cr7Construction of Panchayat Sarkar Bhawan for Bhwanipur, Imadpur, Lahgariya, Kandela Patol and Chaundi Panchayat of Barsoi Block under Katihar district. Katihar ₹15.21 Cr8Construction of 03 (three) Nos. Panchayat Sarkar Bhawan at "Pir Maker, Tara Amnor and Ketuka Lakshi" Panchayat under Block- Maker in District-Saran, Chapra.. Saran ₹8.44 Cr9Construction of 04 (four) Nos. Panchayat Sarkar Bhawan at "Etwa, Kotheya, Mithepur & Bajidpur" Panchayat under Block- Garkha in District-Saran, Chapra. Saran ₹11.08 Cr10Construction of Multistoried Pre-Engineered (G+2) Building, Site Development & Boundary Wall, & STP for the Development of industrial area Jhanjharpur, Madhubani as a Model Green Industrial Area. Madhubani ₹26.77 Cr11Construction of Working Women Hostel at Industrial Area, Sakri, Madhubani Madhubani ₹18.79 Cr12Construction of Working Women Hostel at Vikas Kendra, Maranga, Purnia Purnia ₹17.09 Cr13DEVELOPMENT OF SINGHESHWAR ASTHAN, MADHEPURA. Madhepura ₹77.47 Cr14(Re-Tender) Remaining work of Construction of Auditorium at NIFT, Mithapur, Patna Patna ₹21.55 Cr15(Re-Tender) Construction of Working Women Hostel at Industrial Area, Kumarbagh, West Champaran Pashchim Champaran ₹17.94 Cr16DEVELOPMENT & CONSTRUCTION OF SPECIAL ECONOMY ZONE AT KUMARBAGH INDUSTRIAL AREA DISTRICT WEST CHAMPARAN - BIHAR Pashchim Champaran ₹107.01 Cr17(Re-Tender) Remaining work for Construction of Plug & Play Prefabricated Shed at Bhagalpur, Phase-2 Bhagalpur ₹13.03 Cr
View full company profile →
MS
U68100BR2008PTC013842· Registered 2008-08-12
Private Company limited by shares ₹1.00 Cr paid-up ROC Patna

14 Bihar Projects

1Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :-ANGAR GHAT, BELA MEGH, BELARI, BHAGWANPUR DESUA, BHAGWANPUR KAMLA, BIKUNTHPUR BARANDALA, BIRNAMATULA, CHAITA NORTH, CHAITA SOUTH, CHANDHAR EAST, CHANCHAR WEST, CHADCHAUR MIDDLE, CHANDCHOUR KARHARA, DADHIA MURIARO, GAUPUR, HARPUR REWARI, LAKHANIPUR MAHESH PATTI, LOGHAGIR, MALTI, MEHSARI. PARORIA, PATAILI WEST, PATAILI EAST, RAIPUR, RAMCHANDRAPUR ANDHAIL, SATANPUR, BLOCK :-Ujiyarpur having no. of scheme-278 respectively Total No. of Scheme-278 no. under P.H Division, Samastipur For the year 2024-25. Samastipur ₹5.32 Cr2Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :- AJNAUL, BAMBAIYA HARLAL, BASARIA, BULAKIPUR, CHAK BAHAUDDIN, HARI SHANKARPUR, KAMARAWN, KEWATA, MALPUR PURWARIPATTI, MOKHTIYARPUR SALKAHANI, NAGARGAMA, NAWADA, PAGRA, PANR, SULTANPUR GHATAHO, BHADAIA, BOCHAHA, KALAYANPUR BASTI EAST, KALYANPUR BASTI WEST, KARIM NAGAR, KURSAHA, MOHMADIPUR, BAGHRA, BISHANPUR BER, DASAHRA, DHARNI PATTI WEST, DUMARI NORTH, DUMARI SOUTH, JALALPUR, MADHUPUR SARAI, MOHANPUR, BAHADURPUR PATORI, CHAKSAHO, CHAKSALEM, DARWA, DHAMAUN NORTH, DHAMAUN SOUTH, HARPUR SAIDABAD, HASANPUR SURAT, HETANPUR, IMAN SARAI, INAETPUR, JORPURA, RUPAULI, SHAHPUR UNDI, SHIURA, SIRDILPUR, TARA DHAMAUN, BADAUNA, BAKLRISHNAPUR MORWA, BANGRAHA, BAZIDPUR, GARHSISAI, HARPUR BOCHAHA, MANIYARPUR, MAU DHANESHWARPUR SOUTH, MOUDHANESHPUR N Nawada ₹5.95 Cr3Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :- AJANA, BARHETA, BASUDEOPUR, BELSANDIH, BIRSINGPURE, CHAKMAHESHI, DHRUBGAMA, GOPALPUR, GORAI, GOCINDPUR KHAJURI, HAJPURVA, JITWARIA, KALAUNZER, KHARSAND EAST, KHARSAND WEST, KUCHWA, LADAURA, MADHURAPUR, MALINAGAR, NAMAPUR, PURUSOTTAMPUR, RAMBHADRAPUR, RATWARA, SAIDPUR, SIMARIA BHINDI, SOMNAHA, SORMAR, TIRA, BLOCK :-Kalyanpur having no. of scheme-386 respectively Total No. of Scheme-386 no. under P.H Division, Samastipur For the year 2024-25. Samastipur ₹7.47 Cr4CONSTRUCTION 0F 04 UNIT PANCHAYAT BHAWAN GOVERNMENT BUILDINGS IN RASALPUR,CHANDANATI,SIDHAULI AND PATTOR PANCHAYAT OF HAYAGHAT BLOCK UNDER DARBHANGA DISTRICT INCLUDING ELECTRIFICATION WORK . Darbhanga ₹12.15 Cr5CONSTRUCTION 0F 04 UNIT PANCHAYAT BHAWAN GOVERNMENT BUILDINGS IN GODHIYARI, PANCHOBH,MORO AND NEYAM CHHATAUNA PANCHAYAT OF HANUMANNAGAR BLOCK UNDER DARBHANGA DISTRICT INCLUDING ELECTRIFICATION WORK Darbhanga ₹12.09 Cr6CONSTRUCTION 0F 05 UNIT PANCHAYAT BHAWAN GOVERNMENT BUILDINGS IN PAIGAMBARPUR,RAJORA,JALWARA,SHEKHPUR DANI AND KARJAPATTI PANCHAYAT OF KEOTI BLOCK UNDER DARBHANGA DISTRICT INCLUDING ELECTRIFICATION WORK . Darbhanga ₹15.08 Cr7Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹4.19 Cr8Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹14.03 Cr9Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹6.09 Cr10Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹6.68 Cr11Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹5.37 Cr12Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹6.63 Cr13Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹14.95 Cr14Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in panchayats where “Har Ghar nal Ka Jal” was executed by the “Panchayati Raj Department” with Electric Driven Pumps in the District of Samastipur, Bihar on turn-key basis with 3 months Trial Run Period. Under P.H. Division, Samastipur Samastipur ₹3.25 Cr
View full company profile →
MS
U45200BR2005PTC011430· Registered 2005-07-01
Private Company limited by shares ₹1.00 Cr paid-up ROC Patna

10 Bihar Projects

View full company profile →
MS
U72300BR2015PTC023690· Registered 2015-02-12
Private Company limited by shares ₹2.50 Cr paid-up ROC Patna

9 Bihar Projects

View full company profile →
MS
U45201BR2003PTC010431· Registered 2003-11-20
Private Company limited by shares ₹5.00 L paid-up ROC Patna

9 Bihar Projects

1Restoration of Chhapra Branch Canal from 32.00 R.D to 100.00 R.D. in Siwan District Siwan ₹6.04 Cr2Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in BLOCK :- Badhariya having Total No. of Scheme- 371 Nos. under P.H Division Siwan For the year 2024-25. Siwan ₹8.05 Cr3Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Kuchaikote in 38 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj. Gopalganj ₹9.55 Cr4Anti Erosion work on right bank of river Ganga in front of village Jawaniya (Agenda No. 220/373/2025) Buxar ₹9.50 Cr5Restoration of Anti Erosion work Near Fuli Mishra ka Dera & Keshopur km 13.50 (Agenda No. 222/21/2025) Buxar ₹5.51 Cr6Restoration of Patedha Branch Canal from km 0.00 to 24.21 (Nabard RFID Tranche XXXI) Saran ₹4.61 Cr7Anti Erosion Work in between km 22.00 to km 28.00 of PPE (Agenda No. 11/2026, 12/2026 & 13/2026) Pashchim Champaran ₹6.03 Cr8RESTORATION WORK OF EASTERN GANDAK CANAL SYSTEM UNDER TIRHUT CANAL DIVISION MOTIHARI GROUP NO-01 Purba Champaran ₹5.75 Cr9ANTI EROSION WORK BEFORE FLOOD 2025 AT NAJIRPUR ( L.B.G.E BETWEEN 0.00 KM TO 1.00KM) VILLAGE D/S OF AKHARAGHAT (AGENDA NO-220/74/2025) Muzaffarpur ₹3.47 Cr
View full company profile →