Vendor Directory
Vendors from Bihar
251 MCA-registered companies executing 637 Bihar government infrastructure projects.
Vendors
251
Bihar Projects
637
Total Contract Value
₹33482.78 Cr
Avg. Projects / Vendor
2.5
MS
U45200BR2008PTC013369· Registered 2008-01-16
Private Company limited by shares ₹1.00 L paid-up ROC Patna
3 Bihar Projects
1CONSTRUCTION OF MODEL POLICE STATION BUILDING AND OUT HOUSE WITH ELECTRIFICATION AT HATIDAH POLICE STATION IN THE DISTRICT OF PATNA Patna ₹5.07 Cr2CONSTRUCTION OF MODEL POLICE STATION BUILDING AND OUT HOUSE WITH ELECTRIFICATION AT MEDNI CHOWKI POLICE STATION IN THE DISTRICT OF LAKHISARAI Lakhisarai ₹4.89 Cr3CONSTRUCTION OF DISTRIC PANCHAYAT RESOURCE CENTER AT DANAPUR, (BIHAR) NIT NO 01SBD/2023-24 GROUP NO 01 Patna ₹5.23 Cr
View full company profile →MS
U45202BR2008PTC014059· Registered 2008-11-19
Private Company limited by shares ₹5.00 L paid-up ROC Patna
3 Bihar Projects
1CONSTRUCTION OF PANCHAYAT SARKAR BHAWAN AT PAHLEJA , ISMAILPUR KOIL & JAIPUR PANCHAYAT,BLOCK- KALER IN DIST. ARWAL. Arwal ₹5.06 Cr2CONSTRUCTION OF POLICE STATION BUILDING (G+2 STRUCTURE) WITH ELECTRIFICATION AT PIPLAWAN POLICE STATION IN THE DISTRICT OF PATNA Patna ₹4.11 Cr3Construction of 11 Health & Wellness Centre (Pre-Fab) at Block-Nawanagar, Chaugai & Dumraon, District-Buxar, Bihar Buxar ₹3.93 Cr
View full company profile →MS
U45200BR2001PTC009642· Registered 2001-09-06
Private Company limited by shares ₹5.79 L paid-up ROC Patna
3 Bihar Projects
1CONSTRUCTION OF 30 BEDDED CHC AT DAROLI, SIWAN Siwan ₹4.62 Cr2CONSTRUCTION OF 50 BEDDED CCB (CRITICAL CARE BLOCK) AT DISTRICT HOSPITAL, SIWAN Siwan ₹14.93 Cr3Construction of 2 (Two) Nos. Panchayat Sarkar Bhawan at Hajpurwa and Paterha Panchayat in Maharajganj Block in District- Siwan Tender Id 106157 Siwan ₹4.74 Cr
View full company profile →MS
U45201BR2011PTC017387· Registered 2011-08-29
Private Company limited by shares ₹30.00 L paid-up ROC Patna
3 Bihar Projects
1CONSTRUCTION OF 30 BEDDED CHC AT GONAHA, WEST CHAMPARAN Pashchim Champaran ₹5.02 Cr2Widening & Strengthening Work of Lauriya-Nandangarh Road from Ch. 0+000 to 2+730 (Total Length 2.730 Km) For the year 2024-25 Under Road Division, Bettiah (CRIF) Pashchim Champaran ₹11.18 Cr3CONSTRUCTION WORK OF ROAD FROM MUKHYA SURAKSHA BANDH TO APPROACH ROAD OF LOK NAYAK JAYPRAKASH NARAYAN SMRITI BHAWAN VIA PRABHAVATI DEVI HOSPITAL (ROUTE-01, LENGTH- 1000M) AND MUKHYA SURAKSHA BANDH TO PRABHUNATH NAGAR ROAD VIA HIGH SCHOOL SITAB DIYARA PANCHAYAT SARKAR BHAWAN (ROUTE-02, LENGTH- 1800M) UNDER ROAD DIVISION, CHAPRA FOR THE YEAR 2025-26 Saran ₹6.05 Cr
View full company profile →MS
U45200BR2011PTC016804· Registered 2011-04-04
Private Company limited by shares ₹1.00 L paid-up ROC Patna
3 Bihar Projects
1CONSTRUCTION OF KADAMKUAN POLICE STATION BUILDING (CUSTOMIZED THANA G+3 STRUCTURE ) & OUT HOUSE IN THE DISTRICT OF PATNA - WITH ELECTRIFICATION Patna ₹4.91 Cr2CONSTRUCTION OF MODEL POLICE STATION BUILDING, OUT HOUSE WITH ELECTRIFICATION AT SRI KRISHNAPURI POLICE STATION IN THE DISTRICT OF PATNA Patna ₹4.96 Cr3Construction of 20 P.O. Quarter (G+5) At Judicial Colony Hajipur Vaishali. Vaishali ₹10.95 Cr
View full company profile →EI
U45200BR2013PTC020110· Registered 2013-04-15
Private Company limited by shares ₹3.00 L paid-up ROC Patna
3 Bihar Projects
1Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in BLOCK :-Basantpur & Bhagwanpur Hat having no. of scheme 101 & 273 respectively Total No. of Scheme-374 no. under P.H Division Siwan For the year 2024-25-- Siwan ₹7.66 Cr2Comprehensive Operation & Maintenance and Special repair of ward level piped water supply schemes constructed by “Panchayati Raj Department” and handed over to PHED for a period of 4 years; excluding the cost of energy charges and operator wages in Blocks - Baniyapur and Lahladpur; a total of 487 nos. of schemes in Saran (Chapra) district under P.H. Division, Chapra for the year 2024-25. Saran ₹9.70 Cr3Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in BLOCK :-Siswan & Daraunda having no. of scheme 175 & 198 respectively Total No. of Scheme-373 no. under P.H Division Siwan For the year 2024-25. Siwan ₹7.69 Cr
View full company profile →MS
U45309BR2019PTC040571· Registered 2019-01-14
Private Company limited by shares ₹10.00 L paid-up ROC Patna
3 Bihar Projects
1Construction of 10+2 Level School Building at Various Upgraded Senior Secondary School in State of Bihar (Group No. :- SSS - 2148 ). State-wide ₹8.45 Cr2Electrification Work of Different School Building in Various Block under Saharsa District (Group No.:- RP 080). Saharsa ₹3.67 Cr3Infrastructure Development in Different Secondary/ Higher Secondary Schools at Various Block Under Madhepura District (Group No.:-RS040) Madhepura ₹3.62 Cr
View full company profile →MS
U45309BR2021PTC052107· Registered 2021-05-20
Private Company limited by shares ₹4.31 Cr paid-up ROC Patna
3 Bihar Projects
1Group 6 - Comprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ''Panchayati Raj Department'' and handed over to PHED& Mini Water Supply Scheme for 4 years; excluding the cost of energy charges and operator wages in 344 ward & 396 Scheme of Block - Suppi, Bairgania & Majorganj under P. H. Division, Sitamarhi. Sitamarhi ₹8.60 Cr2Group 8 - Comprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ''Panchayati Raj Department'' and handed over to PHED& Mini Water Supply Scheme for 4 years; excluding the cost of energy charges and operator wages in 403 ward & 480 Scheme of Block - Riga, Parsauni & Belsand, under P. H. Division, Sitamarhi. Sitamarhi ₹10.43 Cr3Comprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for 4 years; excluding the cost of energy charges and operator wages. Sheohar ₹8.23 Cr
View full company profile →MS
U45200BR2014PTC022772· Registered 2014-08-19
Private Company limited by shares ₹50.00 L paid-up ROC Patna
3 Bihar Projects
1VISHNU PAD WALKWAY COM SHED BUILDING, TENSILE STRUCTURES, ALTERNATIVE APPROACH TO THE TEMPLE, AND BUS DEPOT AT GAYA. Gaya ₹50.82 Cr2 CONSTRUCTION OF PATNA HAAT NEAR GANDHI MAIDAN IN PATNA DISTRICT. Patna ₹44.73 Cr3Detailed Estimate for Repairing/ Renovation work of Parivesh Bhawan, Bihar State Pollution Control Board, Patliputra Industrial Area, Patna for the year 2024-25. Patna ₹4.68 Cr
View full company profile →SS
U45500BR2022PTC057603· Registered 2022-04-22
Private Company limited by shares ₹5.00 Cr paid-up ROC Patna
3 Bihar Projects
1DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING FOR CONSTRUCTION OF 150MM X125 MTR DEEP BORING ,INSTALLATION OF 5 HP/3HP MOTOR PUMP AND RISING/DISTRIBUTION MAIN OF LEFTOUT HABITATION WORK OF WATER SUPPLY SCHEME IN WARDS TAKEN OVER FROM PRD TOLA IN ISLAMPUR BLOCKS OF NALANDA DISTRICT.UNDER P.H.DIVISION HILSA FOR THE YEAR 2024-25 in BLOCK-ISLAMPUR. Nalanda ₹3.79 Cr2DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING FOR CONSTRUCTION OF 150MM X125 MTR DEEP BORING ,INSTALLATION OF 5 HP/3HP MOTOR PUMP AND RISING/DISTRIBUTION MAIN OF LEFTOUT HABITATION WORK OF WATER SUPPLY SCHEME IN WARDS TAKEN OVER FROM PRD IN CHANDI , NAGARNAUSHA, THARTHARI, PARWALPUR, EKANGARSARAI BLOCKS OF NALANDA DISTRICT.UNDER P.H.DIVISION HILSA FOR THE YEAR 2024-25. Arwal ₹4.48 Cr3Design, Construction, Supply, Testing and commissioning of WLS Water Supply Schemes for Leftout Tola of taken Over PRD Wards with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division,, Biharsharif (Block- Sarmera). Nalanda ₹5.36 Cr
View full company profile →