Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 9 of 82
- ExpiredSurveying, Collection of Hydrogeological data, Design, Detailed Engineering, Construction, Supply, Installation, Testing and commissioning of Surface Water based Multi-Village piped water supply scheme having 27.00 MLD and 4.00 MLD (Million Liters per Day) Intake well with Approach Bridge Capacity , 27.00 MLD and 4.00 MLD (Million Liters per Day) WTP Capacity, Clean water MGSR (Master Ground Service Reservoir)- 01No., UGR(Underground Reservoir)- 03 Nos., Zonal ESR-23 Nos., MS, DI-K9 Pipe Rising Main Network, HDPE PN10 Distribution Pipeline Network, Pump House ,SITC Electro Mechanical Work including SCADA, Solar System and other related EM work etc., Area Development and Approach Road, Road Resurfacing Work in 19 +4 Panchaytat under Chhatapur Block of Sapaul District, Bihar State with minimum Six months of Trail Run and thereafter operation & Maintenance of the Entire System for the next Five years..
- ExpiredConstruction of 52 Nos. 125mm x 45 MTR. Gravel Packed tubewell & 22 No. 125/115 mm dia 60 MTR Deep Drilled tubewell for Sinking of I.M.-II Handpump with Platform, Drain & Soakpit due to drought condition and falling water level in Water Scarce area of district Nawada under P.H. Division, Nawada through Rajya Yojna for the Year 2025-26.
- ExpiredName of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25.(Block- Fatuha. (1).Panchayat-Usfa ,Habitation Ward No. 1,2,6,7,8,11A,11B ( 2). Panchayat:- Rukunpur, Habitation Ward No.7,14,15 (3). Panchayat:- Pitamberpur, Habitation Ward No. 2,7,8,9,13,15 (4). Panchayat- Mominpur, Habitation Ward No. 1,2,4,6,8,10 (5). Panchayat- Mohiuddinpur, Habitation Ward No. 1,3A,3B,3C (6). Panchayat- Maujipur, Habitation Ward No. 6,7 (7). Panchayat- Mansingpur, Habitation Ward No. 1,2 (8). Panchayat- Kolhar , Habitation Ward No. 1,2,8,9 (9). Panchayat- Gauri Punda , Habitation Ward No.7,8 (10). Panchayat- Bali , Habitation Ward No.1A,1B,6A,6B,12A,12B (11). Panchayat- Alawalpur , Ward No. 14.)
- ExpiredConstruction of (50 nos) 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain and soak pits for drinking water problems solution due to heat wave and fall in water level in the district East Champaran under P. H. Division, Motihari for the year 2025-26
- ExpiredConstruction of 125 mm x 40mm x 61 M deep tube well, Construction of 125/115mm dia 60 Mtr deep drilled tubewell and 125 mm dia and 45 Mtr Deep gravel packed tubewell with India mark-II handpump with platform & drain and Construction of Soakpit in the water scarce rural areas of Munger District under P.H. Division Munger for the year 2025-26.
- ExpiredGR NO-04 Design, Construction, Supply of materials including Testing and Commissioning of 112 Nos. Piped Water Supply Schemes (ward level schemes) for left out habitations under ?Har Ghar nal Ka Jal? nischay yojna in panchayats where ?Har Ghar nal Ka Jal? was executed by the ?Panchayati Raj Department? with Electric Driven Pumps in different habitations of Obra Block in the District of Aurangabad, Bihar on turn-key basis with 3 months Trial Run Period.
- ExpiredConstruction of 30 Nos.125mm X 40mm dia. X 61 meter deep hand operated T/well with India Mark II Hand Pump with Soak Pit and Construction of 35 Nos.125mm X 45 meter deep Gravel Packed T/well (G.P.T) with India Mark II Hand Pump with Soak Pit and construction of 1.85 Mtr. dia. circular P.C.C. Platform and 3.00 mtr P.C.C drain in the drought affected area and as per requirements under the jurisdiction of P.H.Division, Ara. gr-01
- ExpiredConstruction of 25 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Darbhanga in district Darbhanga.
- ExpiredConstruction of 25 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Darbhanga in district Darbhanga.
- ExpiredConstruction of 15 nos 125mmx 45 mtr deep gravel packed T/W(G.P.T) with I.M-II Hand Pump, platform & drain in place of water scarce areas, Block- Tikari at different location Under P.H. Division, Gaya for the year 2024-25 in district Gaya ji. in District of Gaya ji Vide AA 3184/Dt-18-11-2024 of Mining Department, Gaya ji
- ExpiredConstruction of 25 Nos. of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Muzaffarpur
- ExpiredConstruction of 25 Nos. of 125mmx40mmx61M deep tube well, with IM-II handpump with platform, drain and soakpit for Muzaffarpur district under P.H. Division Muzaffarpur
- ExpiredConstruction of 125 mm/ 115 mm x 70.0 Mtr. deep D.T/W ( IS : 15500 (pt-1 to 8)/2004) BY DTH (E.D.S./K.P.D/C.O.PCU) RIG MACHINE WITH BLUE CASING U.P.V.C. PIPE With soak pit 1m dia 2 meter deep with provision of platform and drain for providing drinking water in water scarcity and draught area in Rohtas District under P.H. Division, Sasaram for the Year 2025-26
- ExpiredConstruction of 125mm x 61.0 Mtr. GPT with IM-II hand pump and CONSTRUCTION OF 125 MM DIA AND 45.0 MTR. DEEP GRAVEL PACKED T/W WITH INDIA MARK II HAND PUMP With soak pit 1m dia 2 meter deep with provision of platform and drain for providing drinking water in water scarcity and draught area in Rohtas District under P.H. Division, Sasaram for the Year 2025-26
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Maner) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Naubatpur) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Danapur) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Paliganj) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Dulhin Bazar) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Bikram) for the Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Leftout Tola of PRD WLS Water Supply Schemes with Electric Driven Pumps for Non-Quality Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under P.H. Division, Patna West (Block- Sampatchak and Phulwari) for the Year 2024-25.
- ExpiredConstruction of 07 Nos. new 125mm X 40mm dia X 61 meter deep hand operated T/well and 43 Nos. new 125mm X 45 meter DEEP GRAVEL PACKED T/W with India Mark II Hand Pump with Platform, drain and Soakpit in place of Defunct T/W in Drought area under P.H.Division, Biharsharif for year 2025-26.
- ExpiredGR NO-05 NAME OF WORK- Estimate for Construction of New deep hand-pumps ( India Mark-II) with Simple Boring, GPT Boring & Machine Drilled Boring and Construction of Platform with 3 meter long P.C.C. Drain for providing drinking water in water scarce areas & SC Tolas for summer of 2025 at different places in Aurangabad District under P.H. Division Aurangabad. (Year :? 2025-26.).
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps For Left Out Tolas of Prd Wards in Bhagalpur Districts of Bihar on turn-key basis with 3 months Trial Run after successful completion of Trial Run Period under Mukhya Mantri Nishchay Yojna on Turn Key basis under P. H. Division Bhagalpur East, Bhagalpur Block- Pirpainti, Panchayat- Olapur Ward No. 16A,1A,17A,4A Panchayat- Govindpur Ward No-5A,6A,8A Panchayat Bara Ward No-1A Panchayat Bandhujairam Ward No-1A,2A,13A,14A, Panchayat Rushanpur Ward No-8A,10A,9A,1A Panchayat Rifatpur Simanpur Ward No-6A,3A,1A,2A,8A,7A,5A, Panchayat Parasbanna Ward No-8A, Panchayat Mohanpur Madhuban Ward No-2A,4A,5A,7A,8A,9A, Panchayat Payalapur Ward No-6A,10A,8A,17A, Panchayat Parshurampur Ward No-3A,3B,12A, Panchayat Rajgaon Arazi Ward No-1A,6A,7A,9A,11A Total 42 Nos. Schemes
- ExpiredConstruction of Proposed Office Building of Assistant Engineer, P.H Sub-Division SONAILI under P.H. Division, Katihar for year 2025-26.
- ExpiredConstruction of Proposed Office Building of Assistant Engineer, P.H Sub-Division Manihari under P.H. Division, Katihar for year 2025-26.
- ExpiredConstruction of Proposed Office Building of Assistant Engineer, P.H Sub-Division Barsoi under P.H. Division, Katihar for year 2025-26.
- ExpiredName of Work: Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in panchayats where ?Har Ghar nal Ka Jal? was executed by the ?Panchayati Raj Department? with Electric Driven Pumps in the District of Darbhnaga, Bihar on turn-key basis with 3 months Trial Run Period Under BLOCK ALINAGAR/ KUSHESHWARSTHAN EAST / BAHERI BENIPUR / BIRAUL / GAURABAURAM / GHANSHYAMPUR / KIRATPUR / KUSHESHWARSTHAN / TARDIH / DARBHANGA SADAR / MANIGACHI P.H. Division, Darbhnaga.
- ExpiredName of Work: Design, Construction, Supply of materials, Testing and Commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in panchayats where ?Har Ghar nal Ka Jal? was executed by the ?Panchayati Raj Department? with Electric Driven Pumps in the District of Darbhnaga, Bihar on turn-key basis with 3 months Trial Run Period Under BLOCK BAHADURPUR / HANUMAMNNAGAR / HAYAGHAT / JALE / KEOTI / SINGHWARA P.H. Division, Darbhnaga.
- ExpiredCONSTRUCTION OF PRD's RURAL PIPED WATER SUPPLY SCHEMES "HAR GHAR NAL JAL" SCHEMES THAT HAS BEEN TAKEN OVER BY PHED, FOR SATURATION OF UNCOVERED HABITATION HAVING 45440 HOUSEHOLD UNDER BLOCK-KANTI & SAHEBGANJ, MARWAN,PAROO, SARAIYA, MEENAPUR, KUDHANI, MOTIPUR DISTRICT- MUZAFFARPUR WITH CHLORINATION UNIT & STORAGE ON 8 MTR. STEEL STAGING UNDER ?MUKHYA MANTRI GRAMIN PAYJAL NISHCHAY YOJNA? FOR THE YEAR 2025-2026 UNDER P.H.DIVISION MOTIPUR.
- ExpiredConstruction of 25 Nos. New 125MM X 40MM DIA X 61M deep hand operated Tubewell with INDIA MARK-II handpump with platform & drain & Soakpit in scarce area in Sheohar district under P H Division, Sheohar for the year 2025-26.
- ExpiredConstruction of 25 Nos. New 125MM X 40MM DIA X 61M deep hand operated Tubewell with INDIA MARK-II handpump with platform & drain & Soakpit in scarce area in Sheohar district under P H Division, Sheohar for the year 2025-26.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron (Strike off irrelevant impurity) Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In Aashiyani, Malopara, Nandaniya, Raiber, Routa, Sishabari, Baluwagostra, Chandwar, Chandel, Dhusmal, Kanfaliya, Kanjiya, Khapra Manjhok, Mungrapiyaji, Sirsi Panchyat Of Baisa Block and Aamgachi, Adhang, Bakeniyabreli, Barbatta, Bengramehdipur, Dahuwabari, Dalmalpur, Jhowari, Dhurpeli, Machatta, Majhuwa Hat, Bishanpur, Tiyarpara, Bara Idgah, Bhawanipur, Dahuwabari, Gyandov, Hafaniya, Haripur, Kharaiya, Khari Mahingown, Nitendar, Rangraiya Lal Toli, Talbari, Tiyarpara Panchyat of Amour Block (Total 135Nos. Schemes) in the District of Purnea, Bihar on turn key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Purnea.
- ExpiredSurveying, Collection of Hydrogeological data, Design, Detailed Engineering, Construction, Supply, Installation and commissioning of Ground Water based Multi-Village piped water supply scheme having 7.85 MLD (Million Liter Per Day) Capacity, 09 nos. of Tube Well (Including 03 Nos. of Stand by Tube Well), IGSR(Intermediate Ground Storage Reservoir)-2 Nos, Clean water MGSR (Master Ground Service Reservoir)- 01 No., UGR (Underground Reservoir)- 06 Nos., Zonal ESR-07 Nos., DI-K7 & DI-K9 Distribution Pipeline Network and house connection including SCADA and other related EM work etc. in Panchayat Sadki, Athan, Sarodag, Adhaura, Badwankala, Dumrawa & Chainpura under Adhaura Block of Kaimur District, Bihar State with minimum six months of Trail Run and therafter operation & Maintenances of the Entire System for the next seven years.
- ExpiredDesign, Construction, Supply, Testing and commissioning of piped Water Supply Schemes for left out habitations under "Har Ghar Nal Ka Jal" Nischay in areas having ground water quality issues; with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the in the District of Araria , Bihar on Turn-Key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Gramin Peyjal Nishchay Yojna (Quality Affected) under P.H.Division, Forbesganj.
- ExpiredDesign, Construction, Supply, Testing and commissioning of piped Water Supply Schemes for left out habitations under "Har Ghar Nal Ka Jal" Nischay in areas having ground water quality issues; with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the in the District of Araria , Bihar on Turn-Key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Gramin Peyjal Nishchay Yojna (Quality Affected) under P.H.Division, Forbesganj.
- ExpiredDesign, Construction, Supply, Testing and commissioning of piped Water Supply Schemes for left out habitations under "Har Ghar Nal Ka Jal" Nischay in areas having ground water quality issues; with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the in the District of Araria , Bihar on Turn-Key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Gramin Peyjal Nishchay Yojna (Quality Affected) under P.H.Division, Forbesganj.
- ExpiredConstruction of (50 nos) 125mm X 40mm dia X 61 meter deep hand operated T/well (India Mark II Hand Pump) with Platform, drain and soak pits at water scarce places during Summer season due to low down of water table in the district East Champaran under P. H. Division, Dhaka for the year 2025-26
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Darbhanga in district Darbhanga.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Darbhanga in district Darbhanga.
- ExpiredDesign, Construction, Supply, Testing & Commissioning of Water Supply Scheme (WLS) with electric driven pumps on Trun Key basis under "Har Ghar Nal Ka Jal" Yojna in different leftout habitation of PRD ward in Block:-Fatehpur in Dist-Gaya Under P.H Division-Sherghati for Year 2024-25.
- ExpiredName of The Work: - Design, Construction, Supply, Testing and Commissioning of 277 nos of Piped Water Supply Schemes for habitations left out under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in Block - Ghoghardiha, Jhanjharpur, Lakhnaur, Madhepur & Phulparas of District Madhubani, Bihar on turn-key basis with 3 months Trial Run Period under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Jhanjharpur.(GROUP NO-02)
- ExpiredName of The Work: - Design, Construction, Supply, Testing and Commissioning of 385 Nos. of Piped Water Supply Schemes for habitations left out under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in Block - Andhrathadhi, Babubarhi, Khutauna, Ladaniya & Laukahi of District Madhubani, Bihar on turn-key basis with 3 months Trial Run Period under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Jhanjharpur.(GROUP NO-01)
- ExpiredConstruction of Piped W/S Scheme for BOP with Iron Removal Plant & Chlorination Unit & Storage on 8 mtr Steel Staging In BOP TINKHAMBA (SSB) Araria
- ExpiredConstruction of Piped W/S Scheme for BOP with Iron Removal Plant & Chlorination Unit & Storage on 8 mtr Steel Staging in BOP BELA (SSB) Araria.
- ExpiredDesign, Construction, Supply, Testing, and Commissioning of Water Supply Schemes with Electric-driven Pumps in Left-out Tola/habitation of Prd Wards Where No Work Has Been Done Previously in Saran District of Bihar, on a Turnkey Basis with a Three-month Trial Run After Commissioning Under P.h. Division, Chapra for the Year 2025-26.
- ExpiredName of The Work: - Design, Construction, Supply, Testing and Commissioning of 522 Nos. in Left Out Tola Of PRD Ward Piped Water Supply Schemes for habitations left out under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in Block-Basopatti,Benipatti,Bisfi,Rahika, Harlakhi,Jainagar,Kaluahi,Khajauli,Madhwapur,Pandaul & Rajnagar in District Madhubani, Bihar on turn-key basis with 3 months Trial Run Period under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected) Under P. H. Dvision, Madhubani.(GROUP NO-01)
- ExpiredDesign, Construction of Water Supply Scheme with electric driven motor pump and Arsenic removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Arsenic Affected left out Habitations/wards (Quality affected) with Operation and Maintenance of 60 months after successful completion of minimum six months of Trial Run Period under Mukhya Mantri Gramin Peyjal Nischay Yojana on Turn Key basis under P.H. Division,Lakhisarai. Ward No.-1A,3A,3B,4C,5A,8A,9A,10C,12A,13A,14A panchayat-Mahisauna under Block-Lakhisarai (Total Wards-11 Nos.) GROUP NO- QL-V
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Jhanjharpur in district Madhubani.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Jhanjharpur in district Madhubani.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Jhanjharpur in district Madhubani.
- ExpiredConstruction of 53 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Jhanjharpur in district Madhubani.
- ExpiredEstimate for Construction of Water Supply Scheme for Remaining Pockets Under Block-kaler, Under P.h.division Arwal for the Year 2024-25.
- ExpiredEstimate for Construction of Water Supply Scheme for Remaining Pockets Under Block-karpi Under P.h.division Arwal for the Year 2024-25.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Madhubani in district Madhubani.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Madhubani in district Madhubani.
- ExpiredConstruction of 30 Nos. 125mm x 40mm x 61m Deep hand operated T/W with I.M.-II Hand Pump, Platform & Drain and Construction of Soakpit of 1.0 m dia & 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc in summer and heat situation and in place of water table depletion for the year 2025-26 under P.H. Division, Madhubani in district Madhubani.
- ExpiredSinking of new 125mm X 40mm dia X 61mtr deep hand operated T/well with India Mark II Hand Pump with Platform and drain and also with 1.0 m dia X 2.0 m size soakpit in water scarce habitation in different blocks of Sitamarhi for the year 2025-26
- ExpiredSinking of new 125mm X 40mm dia X 61mtr deep hand operated T/well with India Mark II Hand Pump with Platform and drain and also with 1.0 m dia X 2.0 m size soakpit in water scarce habitation in different blocks of Sitamarhi for the year 2025-26
- ExpiredSinking of new 125mm X 40mm dia X 61mtr deep hand operated T/well with India Mark II Hand Pump with Platform and drain and also with 1.0 m dia X 2.0 m size soakpit in water scarce habitation in different blocks of Sitamarhi for the year 2025-26