Central Government TenderExpired

Design Procurement, Supply, Installation Testing and Commissioning of Plant paging system and Post warranty AMC of 5 years at GGS 1 and 4 Gandhar field Ankleshwar Asset

Issued by: Oil and Natural Gas Corporation Limited
Location: Ankleshwar
Central Government Tender○ Closed
Ref. NoZV7PC24003
Est. ValueNot Disclosed
Deadline01-Oct-2024 03:00 PM
TypeOpen Tender
Ankleshwar
Published 17-Jul-2024 09:00 AM

Tender Specifications & Timeline

14 Fields
Estimated Value
Not Disclosed
Organisation
Oil and Natural Gas Corporation Limited
Reference No.
ZV7PC24003
Status
Expired
Location
Ankleshwar
Source
Central Govt. Portal
Status Stage
Financial Bid Opening
Published Date
17-Jul-2024 09:00 AM
Submission Deadline
01-Oct-2024 03:00 PM
Submission Start
26-Aug-2024 09:00 AM
Bid Opening Date
03-Oct-2024 03:30 PM
Bid Opening Place
SCOPE MINAR NEW DELHI
Pre-Bid Meeting
29-Jul-2024 11:00 AM
Period of Work
2340 Days
L1 Bidder & Competitor IntelligenceFinancial Evaluation

Total Bidders

5

Lowest Bid (L1)

₹1.78 Cr

Estimated Value (PAC)

—

Margin vs Estimate

—

Lowest Bidder (L1) · Award pending

Admitted-Finance

L1 to L2 Spread

+0.40%

Completion Period

2340 days

RankBidder / ContractorQuoted BidGap vs L1vs EstimateStatus
L1₹1.78 Cr0.0% (L1)—Admitted-Finance
L2₹1.79 Cr+0.40%—Admitted-Finance
L3₹2.32 Cr+29.95%—Admitted-Finance
DQ——Rejected-TechRejected-Technical
DQ——Rejected-TechRejected-Technical

This tender covers design Procurement, Supply, Installation Testing and Commissioning of Plant paging system and Post warranty AMC of 5 years at GGS 1 and 4 Gandhar field Ankleshwar Asset, issued by Oil and Natural Gas Corporation Limited under reference ZV7PC24003. The tender is currently Expired. Under financial bid evaluation, Laraon Engineers and Consultants Pvt. Ltd. emerged as the lowest (L1) bidder with a quoted bid amount of ₹1.78 Cr.

This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in Ankleshwar. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.

Tender Documents

Download official tender documents, technical specifications, schedules, and BOQ files

4 Files Available
PDF

technical_220592.pdf

Download Document
PDF

techsummary_220592.pdf

Download Document
PDF

finance_220592.pdf

Download Document
BOQ COMPARATIVE CHART

BOQ Comparative Chart

Download Document
Submitted Bids & Bidder Details
Allot System Integration Private Limited
#744372
Admitted-Finance
Submitted: 01-Oct-2024 02:31 PM
Fin. Value: 23177311.32
Rank: L3
Updated: 19-Dec-2024 04:01 PM
COMMUNICA AIDS
#744500
Rejected-Technical
Submitted: 30-Sep-2024 12:32 PM
Fin. Value: —
Rank: —
Updated: 18-Dec-2024 02:08 PM

technically rejected

Laraon Engineers and Consultants Pvt. Ltd.
#737353
Admitted-Finance
Submitted: 23-Sep-2024 04:12 PM
Fin. Value: 17836035.75
Rank: L1
Updated: 19-Dec-2024 04:01 PM
Prolink Engineers
#740244
Rejected-Technical
Submitted: 23-Sep-2024 01:09 PM
Fin. Value: —
Rank: —
Updated: 18-Dec-2024 02:08 PM

technically rejected

Willstrong Solutions Pvt Ltd
#748518
Admitted-Finance
Submitted: 24-Sep-2024 12:27 PM
Fin. Value: 17906651.36
Rank: L2
Updated: 19-Dec-2024 04:01 PM

Bid Evaluation Details & Logs

Technical

technical bid opening

Date: 03-Oct-2024 03:50 PM

Officer: MODON MOHAN DOLEY

Tender Opening report attached

technical evaluation

technical evaluation

Date: 18-Dec-2024 02:08 PM

Officer: PRAKASH SINGH

Finance

finance bid opening

Date: 19-Dec-2024 04:01 PM

Officer: PRAKASH SINGH

Price bid opened on 19.12.2024.

About This Procurement Notice

This central government tender was issued by Oil and Natural Gas Corporation Limited. Bids must be submitted by 01-Oct-2024 03:00 PM.

BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.

?

Frequently Asked Questions

QWhat is the status of the tender "Design Procurement, Supply, Installation Testing and Commissioning of Plant pagi"?
The current status of this tender is "Expired". The submission deadline is 01-Oct-2024 03:00 PM. This information is sourced from official government procurement portals.
QWho issued this central government tender?
This tender was issued by Oil and Natural Gas Corporation Limited. The reference number is ZV7PC24003. It is a central government procurement notice.
QWhat is the estimated value of this tender?
The estimated tender value has not been disclosed for this procurement notice. Please refer to the official tender documents for detailed specifications.
QWho is the lowest (L1) bidder for this tender?
Under financial bid evaluation for "Design Procurement, Supply, Installation Testing and Commissioning of Plant paging system and Post warranty AMC of 5 years at GGS 1 and 4 Gandhar field Ankleshwar Asset", Laraon Engineers and Consultants Pvt. Ltd. emerged as the lowest (L1) bidder with a quoted bid amount of ₹1.78 Cr. Full bid rankings and vendor comparisons are available on BiharInfraTales.