Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800)(PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode
Tender Specifications & Timeline
14 FieldsTotal Bidders
13
Lowest Bid (L1)
₹307.73 Cr
Estimated Value (PAC)
₹531.02 Cr
Margin vs Estimate
-42.05%
L1 to L2 Spread
+5.61%
Completion Period
730 days
| Rank | Bidder / Contractor | Quoted Bid | Gap vs L1 | vs Estimate | Status |
|---|---|---|---|---|---|
| L1 | SRM CONTRACTORS PRIVATE LIMITED#2879857 | ₹307.73 Cr | 0.0% (L1) | -42.05% | Admitted-Finance |
| L2 | Vishal Infrastructure Ltd#2881075 | ₹325.00 Cr | +5.61% | -38.80% | Admitted-Finance |
| L3 | ₹339.85 Cr | +10.44% | -36.00% | Admitted-Finance | |
| L4 | ABCI Infrastructures Pvt Ltd#2881356 | ₹355.00 Cr | +15.36% | -33.15% | Admitted-Finance |
| L5 | Barbrik Project Limited#2881419 | ₹355.15 Cr | +15.41% | -33.12% | Admitted-Finance |
| L6 | ₹361.00 Cr | +17.31% | -32.02% | Admitted-Finance | |
| L7 | ₹366.00 Cr | +18.94% | -31.08% | Admitted-Finance | |
| L8 | RSM INFRA PROJECTS#2878745 | ₹374.11 Cr | +21.57% | -29.55% | Admitted-Finance |
| L9 | RCC DEVELOPERS LTD#2881816 | ₹399.00 Cr | +29.66% | -24.86% | Admitted-Finance |
| L9 | Waterfront Constructions Pvt Ltd#2882205 | ₹399.00 Cr | +29.66% | -24.86% | Admitted-Finance |
| L10 | Transrail Lighting Limited#2881651 | ₹450.90 Cr | +46.53% | -15.09% | Admitted-Finance |
| DQ | — | — | Rejected-Tech | Rejected-Technical | |
| DQ | RITHWIK PROJECTS PRIVATE LIMITED#2880229 | — | — | Rejected-Tech | Rejected-Technical |
This roads & highways tender covers rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800)(PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode, issued by Ministry of Road Transport and Highways under reference RW/NH-12014/1495/2021/JK-Z-II. The estimated contract value is ₹531.02 Cr, and the tender is currently Expired. Under financial bid evaluation, SRM CONTRACTORS PRIVATE LIMITED emerged as the lowest (L1) bidder with a quoted bid amount of ₹307.73 Cr.
This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in JAMMU AND KASHMIR. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.
Tender Documents
Download official tender documents, technical specifications, schedules, and BOQ files
13_Result.pdf
technical_806444.pdf
techsummary_806444.pdf
finance_806444.pdf
BOQ Comparative Chart
Non Responsive as the does not qualify under one completed tunnel work as per RFP (since the length of tunnel executed by the bidders is 2012 m and is less than 2908 m ) (that is 90 percent of the total length of tunnel of 3231 m)
Non Responsive as the does not qualify under one completed tunnel work as per RFP (Partial execution of the pre closed work can not be considered as the completed project)
| Bidder | Submitted On | Status | Fin. Value | Rank | Remarks / Logs |
|---|---|---|---|---|---|
ABCI Infrastructures Pvt Ltd #2881356 | 15-Sep-2023 04:50 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3550000000.00 | L4 | — |
Barbrik Project Limited #2881419 | 15-Sep-2023 12:47 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3551490000.00 | L5 | — |
Bharat Constructions (India) Pvt. Ltd. #2882211 | 15-Sep-2023 03:00 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3610000000.00 | L6 | — |
Dineshchandra R.Agrawal Infracon Pvt.Ltd #2882221 | 15-Sep-2023 03:51 PM | Rejected-Technical Updated: 19-Dec-2023 04:51 PM | — | — | Non Responsive as the does not qualify under one completed tunnel work as per RFP (since the length of tunnel executed by the bidders is 2012 m and is less than 2908 m ) (that is 90 percent of the total length of tunnel of 3231 m) |
Gammon Engineers and Contractors Private Limited #2880370 | 15-Sep-2023 04:16 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3659999999.00 | L7 | — |
M/S R and C INFRAENGINEERS PVT LTD #2882077 | 15-Sep-2023 04:39 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3398528000.00 | L3 | — |
RCC DEVELOPERS LTD #2881816 | 15-Sep-2023 02:07 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3990000000.00 | L9 | — |
RITHWIK PROJECTS PRIVATE LIMITED #2880229 | 15-Sep-2023 04:56 PM | Rejected-Technical Updated: 19-Dec-2023 04:51 PM | — | — | Non Responsive as the does not qualify under one completed tunnel work as per RFP (Partial execution of the pre closed work can not be considered as the completed project) |
RSM INFRA PROJECTS #2878745 | 15-Sep-2023 03:42 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3741111111.00 | L8 | — |
SRM CONTRACTORS PRIVATE LIMITED #2879857 | 15-Sep-2023 02:53 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3077260900.00 | L1 | — |
Transrail Lighting Limited #2881651 | 15-Sep-2023 03:53 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 4509000000.00 | L10 | — |
Vishal Infrastructure Ltd #2881075 | 15-Sep-2023 04:44 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3250000000.00 | L2 | — |
Waterfront Constructions Pvt Ltd #2882205 | 15-Sep-2023 04:57 PM | Admitted-Finance Updated: 27-Dec-2023 03:52 PM | 3990000000.00 | L9 | — |
Bid Evaluation Details & Logs
technical bid opening
Date: 19-Dec-2023 04:37 PM
Officer: Anand Mohan Prasad
Summary
technical evaluation
Date: 19-Dec-2023 04:51 PM
Officer: Anand Mohan Prasad
finance bid opening
Date: 27-Dec-2023 03:52 PM
Officer: QAMRE ALAM
Financial Summary
About This Procurement Notice
This central government tender was issued by Ministry of Road Transport and Highways. The estimated contract value is ₹531.02 Cr. Bids must be submitted by 15-Sep-2023 05:00 PM.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km"?
- The current status of this tender is "Expired". The submission deadline is 15-Sep-2023 05:00 PM. This information is sourced from official government procurement portals.
- QWho issued this central government tender?
- This tender was issued by Ministry of Road Transport and Highways. The reference number is RW/NH-12014/1495/2021/JK-Z-II. It is a central government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value is ₹531.02 Cr. This is the approximate contract value as disclosed in the official tender document.
- QWho is the lowest (L1) bidder for this tender?
- Under financial bid evaluation for "Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800)(PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode", SRM CONTRACTORS PRIVATE LIMITED emerged as the lowest (L1) bidder with a quoted bid amount of ₹307.73 Cr. Full bid rankings and vendor comparisons are available on BiharInfraTales.