Construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad under AMRUT and state plan Scheme with operation & maintenance work for five years, with - (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., Distribution Network 96.68 km, Service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.
Tender Specifications & Timeline
17 FieldsPurchase Order & Contract Award
Official eProcurement award disclosure & contractor details
PO #16825
PO Date:2023-06-09
Work Commencement:2023-06-10
Validity / Expiry:2023-06-16
Construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad under AMRUT and state plan Scheme with operation & maintenance work for five years, with - (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., Distribution Network 96.68 km, Service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.
Purchase Order #
Official PO
Awarded Contract Value
₹132.67 Cr
Estimated Value (PAC)
₹135.07 Cr
Margin vs Estimate
-1.77%
This roads & highways tender covers construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad under AMRUT and state plan Scheme with operation & maintenance work for five years, with - (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., Distribution Network 96.68 km, Service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos., issued by Rajesh Kumar Gupta under reference BUIDCo/Yo-2579/22-50. The estimated contract value is ₹135.07 Cr, and the tender is currently Expired. Following contract finalisation, the work was awarded to umang infrastructure under Purchase Order #16825 for a total value of ₹132.67 Cr.
This procurement is part of ongoing efforts by Bihar government departments to maintain and upgrade public infrastructure and services in Bihar. Vendors interested in similar opportunities can browse other tenders from the same issuing department below.
Authority & Contacts
Dealing / Issuing Officer
Mr RAJESH GUPTA (EXECUTIVE ENGINEER)
Designation: Project Director
Organization: Bihar Urban Infrastructure Development Corporation Ltd.
Approving Authority
RAJESH KUAMR GUPTA
Designation: Project Director
Organization: Bihar Urban Infrastructure Development Corporation Ltd.
About This Procurement Notice
This Bihar state government tender was issued by Rajesh Kumar Gupta. The estimated contract value is ₹135.07 Cr. Bids must be submitted by 2023-05-16 17:00:00.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad unde"?
- The current status of this tender is "Expired". The submission deadline is 2023-05-16 17:00:00. This information is sourced from official government procurement portals.
- QWho issued this Bihar government tender?
- This tender was issued by Rajesh Kumar Gupta. The reference number is BUIDCo/Yo-2579/22-50. It is a Bihar state government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value is ₹135.07 Cr. This is the approximate contract value as disclosed in the official tender document.
- QWho won the contract for this tender?
- The contract for "Construction of water supply scheme (phase-II) of Aurangabad Nagar Parishad under AMRUT and state plan Scheme with operation & maintenance work for five years, with - (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., Distribution Network 96.68 km, Service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos." was awarded to umang infrastructure under Purchase Order #16825 with an awarded contract value of ₹132.67 Cr.
- QWhat is the final awarded contract value?
- The final awarded contract value is ₹132.67 Cr (1.78% below the estimated PAC of ₹135.07 Cr).