Construction & Resetting of new Pontoon Bridge (Fabrication- 65 Sets and 45 old sets Total 110 sets) of pontoon and maintenance of Pontoon Bridge from 2022-23 to 2027-28 and dismantling of Pontoon Bridge from the Alignment and storing the Pontoon set at safe place on the side of River embankment at Ghaghra (Sarayug) between Sitab Diara Ghat to Rivilganj Mandir Ghat in saran district during rainy season and watching the Pontoon sets safety anchored along the River embankment during rainy season for six month as well as re-arranging the Pontoon sets whenever required due to increasing and decreasing of water level.
Tender Specifications & Timeline
14 FieldsThis bridges tender covers construction & Resetting of new Pontoon Bridge (Fabrication- 65 Sets and 45 old sets Total 110 sets) of pontoon and maintenance of Pontoon Bridge from 2022-23 to 2027-28 and dismantling of Pontoon Bridge from the Alignment and storing the Pontoon set at safe place on the side of River embankment at Ghaghra (Sarayug) between Sitab Diara Ghat to Rivilganj Mandir Ghat in saran district during rainy season and watching the Pontoon sets safety anchored along the River embankment during rainy season for six month as well as re-arranging the Pontoon sets whenever required due to increasing and decreasing of water level., issued by Sushil Kumar under reference BRPNNL-NIT-11-2022-23. The estimated contract value is ₹38.98 Cr, and the tender is currently Expired.
This procurement is part of ongoing efforts by Bihar government departments to maintain and upgrade public infrastructure and services in Bihar. Vendors interested in similar opportunities can browse other tenders from the same issuing department below.
Authority & Contacts
Dealing / Issuing Officer
Mr Pamit Shahi (EXECUTIVE ENGINEER)
Designation: Senior Project Engineer
Organization: BIHAR RAJYA PUL NIRMAN NIGAM LIMITED
Approving Authority
Sushil Kumar
Designation: Senior Project Engineer
Organization: BIHAR RAJYA PUL NIRMAN NIGAM LIMITED
About This Procurement Notice
This Bihar state government tender was issued by Sushil Kumar. The estimated contract value is ₹38.98 Cr. Bids must be submitted by 2023-02-07 15:00:00.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Construction & Resetting of new Pontoon Bridge (Fabrication- 65 Sets and 45 old "?
- The current status of this tender is "Expired". The submission deadline is 2023-02-07 15:00:00. This information is sourced from official government procurement portals.
- QWho issued this Bihar government tender?
- This tender was issued by Sushil Kumar. The reference number is BRPNNL-NIT-11-2022-23. It is a Bihar state government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value is ₹38.98 Cr. This is the approximate contract value as disclosed in the official tender document.