Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
MDRRCD BiharCompleted

Construction of Proposed HL RCC Bridge 2 x 14m in Place of UN Bridge GAP at 12th Km, Ch. 11.470 of Kharwara Road to Baluganj Road under PMGSY RCPLWEA in RCD, Road Division No. 1, Aurangabad

#589
Road Division Aurangabad.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road ProjectCompleted
Agreement₹2.10 Cr
Length0.03 km
Start27-08-2019
Completion26-08-2020
MDR · South Wing
Road Division Aurangabad.
M/S SHARDA CONSTRUCTION

Project Details

Project No.589
WingSouth Wing
DivisionRoad Division Aurangabad.
CircleMagadh Road Circle Gaya
Road TypeMDR
HeadState Plan

Cost & Timeline

Agreement Value₹2.10 Cr
Sanctioned Length0.03 km
ContractorM/S SHARDA CONSTRUCTION
AA Date15-02-2019
Start Date27-08-2019
Expected Completion26-08-2020

Construction of Proposed HL RCC Bridge 2 x 14m in Place of UN Bridge GAP at 12th Km, Ch. 11.470 of Kharwara Road to Baluganj Road under PMGSY RCPLWEA in RCD, Road Division No. 1, Aurangabad is a Bihar Road Construction Department (RCD) project under Road Division Aurangabad., classified as a MDR. The agreement amount for this project is ₹2.10 Cr, and the current status is Completed.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Frequently Asked Questions

What is the current status of the Bihar RCD project "Construction of Proposed HL RCC Bridge 2 x 14m in Place of UN Bridge GAP at 12th"?
Status: Completed. This MDR project under Road Division Aurangabad. (Magadh Road Circle Gaya) covers 0.03 km of road work. Expected completion: 26-08-2020.
Who is the contractor for RCD project 589?
The contractor for this project is M/S SHARDA CONSTRUCTION. Project number: 589. Division: Road Division Aurangabad.. Administrative approval date: 15-02-2019.
What is the agreement value for this Bihar road project?
The agreement value for "Construction of Proposed HL RCC Bridge 2 x 14m in Place of U" is ₹2.10 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Aurangabad..
What does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 589 "Construction of Proposed HL RCC Bridge 2 x 14m in Place of U" is one of thousands of road improvement and construction works tracked by BiharInfraTales.