MDRRCD BiharCompleted

CONSTRUCTION OF RCC BOX BRIDGE BETWEEN KACHAN TO AMBABAR ROAD AT CH . 2250 METER UNDER RCPLWEA FOR YEAR 2022-23 (PACKAGE NO - BR12RC337A)

#559
Road Division Sherghati.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project✓ Completed
Agreement₹83.16 L
Length0.02 km
Start19-12-2022
Completion18-04-2023
MDR · South Wing
Road Division Sherghati.
Charan Mahadeo Construction Private Limited

Project Details

6 Fields
Project No.
559
Wing
South Wing
Division
Road Division Sherghati.
Circle
Magadh Road Circle Gaya
Road Type
MDR
Head
State Plan

Cost & Timeline

6 Fields
Agreement Value
₹83.16 L
Sanctioned Length
0.02 km
Contractor
Charan Mahadeo Construction Private Limited
AA Date
30-09-2022
Start Date
19-12-2022
Expected Completion
18-04-2023

CONSTRUCTION OF RCC BOX BRIDGE BETWEEN KACHAN TO AMBABAR ROAD AT CH . 2250 METER UNDER RCPLWEA FOR YEAR 2022-23 (PACKAGE NO - BR12RC337A) is a Bihar Road Construction Department (RCD) project under Road Division Sherghati., classified as a MDR. The agreement amount for this project is ₹0.83 Cr, and the current status is Completed.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Remarks

Protection work in progress SUB STRUCTURE COMPLETED. SUPER STRUCTURE WORK COMPLETED

?

Frequently Asked Questions

QWhat is the current status of the Bihar RCD project "CONSTRUCTION OF RCC BOX BRIDGE BETWEEN KACHAN TO AMBABAR ROAD AT CH . 2250 METER"?
Status: Completed. This MDR project under Road Division Sherghati. (Magadh Road Circle Gaya) covers 0.02 km of road work. Expected completion: 18-04-2023.
QWho is the contractor for RCD project 559?
The contractor for this project is Charan Mahadeo Construction Private Limited. Project number: 559. Division: Road Division Sherghati.. Administrative approval date: 30-09-2022.
QWhat is the agreement value for this Bihar road project?
The agreement value for "CONSTRUCTION OF RCC BOX BRIDGE BETWEEN KACHAN TO AMBABAR ROA" is ₹83.16 L. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Sherghati..
QWhat does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 559 "CONSTRUCTION OF RCC BOX BRIDGE BETWEEN KACHAN TO AMBABAR ROA" is one of thousands of road improvement and construction works tracked by BiharInfraTales.