Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
MDRRCD BiharCompleted

Construction of High Level Bridge over Radwa River in 5th Km of Sheikhpura-Shahpur Road Under Road Division, Sheikhpura for the year 2018-19

#195
Road Division Sheikhpura.
Road Circle Munger
Bihar RCD PMIS — Road ProjectCompleted
Agreement₹3.30 Cr
Length0.03 km
Start04-09-2020
Completion03-07-2021
MDR · South Wing
Road Division Sheikhpura.
Rajesh Kumar

Project Details

Project No.195
WingSouth Wing
DivisionRoad Division Sheikhpura.
CircleRoad Circle Munger
Road TypeMDR
HeadState Plan

Cost & Timeline

Agreement Value₹3.30 Cr
Sanctioned Length0.03 km
ContractorRajesh Kumar
AA Date29-01-2019
Start Date04-09-2020
Expected Completion03-07-2021

Construction of High Level Bridge over Radwa River in 5th Km of Sheikhpura-Shahpur Road Under Road Division, Sheikhpura for the year 2018-19 is a Bihar Road Construction Department (RCD) project under Road Division Sheikhpura., classified as a MDR. The agreement amount for this project is ₹3.30 Cr, and the current status is **Completed**.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Remarks

Work Completed.

Frequently Asked Questions

What is the current status of the Bihar RCD project "Construction of High Level Bridge over Radwa River in 5th Km of Sheikhpura-Shahp"?
Status: Completed. This MDR project under Road Division Sheikhpura. (Road Circle Munger) covers 0.03 km of road work. Expected completion: 03-07-2021.
Who is the contractor for RCD project 195?
The contractor for this project is Rajesh Kumar. Project number: 195. Division: Road Division Sheikhpura.. Administrative approval date: 29-01-2019.
What is the agreement value for this Bihar road project?
The agreement value for "Construction of High Level Bridge over Radwa River in 5th Km" is ₹3.30 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Sheikhpura..
What does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 195 "Construction of High Level Bridge over Radwa River in 5th Km" is one of thousands of road improvement and construction works tracked by BiharInfraTales.