East Central RailwayIn Progress

Construction of water treatment plant, Extension of Officer's Club at 2nd & 3rd floor, Provision of Rainwater Harvesting System, Waste Water Automatic Recycling plant, Lawn Tennis Court, Volleyball court, Vertical garden, Fountain, Sprinkler system, Heat & Chill pump, acoustic proofing of club & Sports Complex, modification of Sports Complex, Boundary wall, Drain and other miscellaneous work at Patlipura Rail Parishar, Dighaghat, Patna.

Work #283
As of June 2026

Estimate Cost

₹25.93 Cr

Sanctioned estimate

Tendered Cost

₹23.34 Cr

-10.0% vs estimate

Physical Progress

44%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹23.34 Cr
Progress44%
Started15-05-2020
Target DOC30-06-2026
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP

Work Details

5 Fields
Work No.
283
Agency
Lord Vishnu Construction Pvt. Ltd
101 Lotus Apartment, New Patliputra Colony, Patna-800014
Acceptance / LOA
LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-129-19-20/01007930018747 DT 05.05.2020; ECR/CAO/Con/WT/Agt/101 Dated: 21.05.2020
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹25.93 Cr
Tendered Cost
₹23.34 Cr
Physical Progress
44%
Date Started
15-05-2020
Original DOC
15-04-2024
Extended DOC
30-06-2026

Construction of water treatment plant, Extension of Officer's Club at 2nd & 3rd floor, Provision of Rainwater Harvesting System, Waste Water Automatic Recycling plant, Lawn Tennis Court, Volleyball court, Vertical garden, Fountain, Sprinkler system, Heat & Chill pump, acoustic proofing of club & Sports Complex, modification of Sports Complex, Boundary wall, Drain and other miscellaneous work at Patlipura Rail Parishar, Dighaghat, Patna. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Lord Vishnu Construction Pvt. Ltd.. The tendered cost of the work is ₹23.34 Cr, and it is currently In Progress with physical progress recorded at 44%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 23.34 after 2nd variation value 26.07

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of water treatment plant, Extension of Officer's Club at 2nd & 3rd "?
Status: In Progress. This East Central Railway work is being executed by Lord Vishnu Construction Pvt. Ltd.. Physical progress stands at 44%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Lord Vishnu Construction Pvt. Ltd, 101 Lotus Apartment, New Patliputra Colony, Patna-800014. Acceptance / agreement reference: LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-129-19-20/01007930018747 DT 05.05.2020; ECR/CAO/Con/WT/Agt/101 Dated: 21.05.2020. Work started on 15-05-2020.
QWhat is the cost of this railway work?
The tendered cost of "Construction of water treatment plant, Extension of Officer'" is ₹23.34 Cr (against an estimate of ₹25.93 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of water treatment plant, Extension of Officer'" is one of hundreds of railway works covered.